Navigation Search Map (504) 658-4000

Translate this page

The City of New Orleans

Mayor Mitchell J. Landrieu

« Back to Projects

All DPW Projects

DPW Projects (current as of October 18, 2016)
Project ID Project Name DPW Funding Type Current Phase Council District Neighborhood Current Budget Const Start Const Complete Scope of Work
DPW509 2014 Drainage Point Repairs City Funded Complete ABCDE City Wide $289,118.50 03-Nov-14 A 31-Dec-14 A Roadway excavation, drain line repair and replacement, and repaving of the  roadway.
DPW518 2015 Drainage Point Repairs City Funded Complete ABCDE City Wide $200,000.00 15-May-15 A 31-Dec-15 A Roadway excavation, drain line repair and replacement, and repaving of the  roadway.
DPW578 2016 Alley Maintenance City Funded Planned ABCDE Citywide $0.00 01-Jan-16 A Oct-Nov-Dec 2016 May include grading or leveling the allies with existing or additional fill material by hand or with construction equipment. This project is funded with Maintenance funds, no additional Capital budget funds are necessary.
DPW569 2016 Drainage Point Repairs City Funded Construction ABCDE City Wide $200,000.00 01-Jan-16 A Oct-Nov-Dec 2016 Roadway excavation, drain line repair and replacement, and repaving of the  roadway.
DPW576 2016 FQ Drainage Improvements (Dumaine, Gov Nicholls) City Funded Construction C French Quarter $831,804.60 27-Jun-16 A Oct-Nov-Dec 2016 Roadway excavation, drain line repair and replacement, and repaving of the roadway, ADA ramps and sidewalks  replacement.
DPW552 Academy Park Drainage Upgrades Federal Design E Plum Orchard $6,500,000.00 Apr-May-Jun 2018 Oct-Nov-Dec 2018 This project  is intended to help alleviate flooding by increasing the capacity of subsurface  drainage between local streets and trunk lines as well as by using green  infrastructure options which may include retention/detention basins, street  basins, rain gardens, and street side bioswales.
DPW381 ADA Access Ramps in CBD Federal Construction B Central Business District $380,940.60 10-Nov-14 A Oct-Nov-Dec 2016 Installation of new ADA compliant  ramps in the CBD.
DPW438 Alabo St. (Chartres - Port) CDBG Funded Complete E Holy Cross $366,666.67 18-Aug-14 A 29-Sep-14 A Rehabilitation of asphalt pavement including mill, patching, and 2-inch  overlay. Additional improvements include sidewalk repair, construction of ADA  ramps, installation of high-visibility crosswalks, and other roadway  striping.
DPW003 Alcee Fortier Blvd Streetscape (Chef Menteur Hwy - Michoud Lagoon) CDBG Funded Complete E Village de Lest $479,640.84 15-Aug-13 A 30-Apr-14 A May include sidewalk or other pedestrian walkway improvements,  bikeways, traffic and pedestrian signage or signalization, landscaping,  lighting, or public art.
DPW004 Algiers (Traffic Signal) Federal Complete C Algiers Point/McDonough/Behrman $3,991,109.00 02-Apr-12 A 21-Nov-13 A Traffic signal improvements
DPW553 Algiers Drainage Upgrades Federal Design C West Bank Neighborhoods $4,000,000.00 Apr-May-Jun 2018 Oct-Nov-Dec 2018 This project  is intended to help alleviate flooding by increasing the capacity of subsurface  drainage between local streets and trunk lines as well as by using green  infrastructure options which may include retention/detention basins, street  basins, rain gardens, and street side bioswales.
DPW343 Alvar St. (Chef Menteur - Higgins) PTP Complete D Desire Area $677,527.00 09-Jul-12 A 01-Nov-12 A Remove and  replace existing roadway, install new American  with Disabilities Act-compliant curb ramps. Visit www.pavinglaroads.com for additional  detail.
DPW342 Alvar St. (Higgins - Florida) PTP Complete D Desire Dev $677,527.00 09-Jul-12 A 01-Nov-12 A Remove and  replace existing roadway, install new American  with Disabilities Act-compliant curb ramps. Visit www.pavinglaroads.com for additional  detail.
DPW558 Annunciation St. (Jackson - Josephine) CDBG Funded Complete B St. Thomas Dev $80,000.00 13-Jun-16 A 21-Jul-16 A This project will accomplish the rehabilitation of  asphalt pavement including, milling, full depth patching and 2-inch overlay,  clearing and sealing of joints and curb repair. Additional improvements may  include features to improve access for all users such as sidewalk repair, construction of ADA ramps,  installation of high-visibility crosswalks and other roadway striping, and  installation of new way finding and other street  signage.
DPW287 Arise Academy - Safe Routes to School (K08-572) State ID 737-99-1024 City Funded Construction CD Bywater $343,334.00 26-Jan-15 A Jan-Feb-Mar 2017 Construct curb extensions with ADA compliant ramps at 16  locations, countdown pedestrian signals at 6 locations, pavement markings for  crosswalks at 16 locations, and miscellaneous markings and signs all in the  immediate vicinity of the Dr. Charles R. Drew Elementary School.  State  Project No. 737-36-0015 and Federal Project No. SRS-3608 (504).
DPW449 Aubry St. (Broad - Gentilly) CDBG Funded Bid & Award D Fairgrounds $2,312,671.00 Oct-Nov-Dec 2016 Apr-May-Jun 2017 This project will perform roadway improvements on  Aubry Street from North Broad to Gentilly Boulevard.  The project scope  of work will be to remove the existing asphalt overlay and roadway base and  replace with concrete pavement including panel installation, new base and  sub-base, sealing of joints, curb repair, reconstruction/adjustment to existing  catch basins and manholes, and new instillation of catch basins and  manholes.  This project will also install new subsurface utilities  including drain lines, sewer, and water lines.  Additional improvements may  include features to improve access for all users such as sidewalk repair, construction of ADA ramps,  installation of high-visibility crosswalk and other roadway striping, and  installation of new way finding and other street  signage.
DPW009 Audubon Blvd. (Willow St - S. Claiborne Ave) City Funded Complete A Audubon $6,177,231.00 18-Oct-10 A 26-Jun-12 A Reconstruction of existing roadway,  including the replacement of affected utilities.
DPW363 Banks St. (Carrollton - St. Patrick) PTP Complete A Mid-City $829,492.00 06-Nov-13 A 12-Mar-14 A Remove and  replace existing roadway, install new American  with Disabilities Act-compliant curb ramps. Visit www.pavinglaroads.com for additional  detail.
DPW384 Baronne St. (Canal St - Calliope St.) PTP Complete B Central Business District $1,392,336.00 24-Mar-14 A 17-Oct-14 A Remove and  replace existing roadway, install new American  with Disabilities Act-compliant curb ramps. Visit www.pavinglaroads.com for additional  detail.
DPW354 Basin St. (Canal - N. Claiborne) PTP Complete C Treme - Lafitte $1,878,613.00 22-Nov-13 A 03-Dec-13 A Remove and  replace existing roadway, install new American  with Disabilities Act-compliant curb ramps. Visit www.pavinglaroads.com for additional  detail.
DPW010 Bayou Rd Streetscape (Broad St - Rocheblave St) CDBG Funded Complete D Seventh Ward $987,934.95 07-May-14 A 13-Feb-15 A May include sidewalk or other pedestrian walkway improvements,  bikeways, traffic and pedestrian signage or signalization, landscaping,  lighting, or public art.
DPW560 Behrman Highway Multi-Use Path Connection City Funded Complete C Tall Timbers - Brechtel $109,065.00 09-Apr-16 A 29-Apr-16 A Construction of a 10'  bicycle/pedestrian path to connect the Tall Timbers/Brechtel neighborhood to the  Walmart shopping Center and existing sidewalk along LA 428 Behrman  Highway.  Project limits are Old Behrman Highway - Tullis  Drive.
DPW530 Bellecastle (Laurel St. - Constance St.) City Funded Complete B West Riverside $25,000.00 27-Jul-15 A 31-Jul-15 A Asphalt Patching
DPW011 Berkley Dr (Huntlee Canal - Woodland Dr) City Funded Complete C Old Aurora $6,646,591.00 14-Feb-11 A 15-Mar-12 A Reconstruction of existing roadway,  including the replacement of affected utilities.
DPW012 Berkley Dr (Kabel Dr - Huntlee Dr), Somerset Dr (Berkley Dr - MacArthur Blvd) City Funded Complete C Old Aurora $4,982,107.39 19-Jan-15 A 29-Jan-16 A Reconstruction of existing roadway, including the replacement of  affected utilities.
DPW364 Bienville St. (Jefferson Davis - Carrollton) PTP Complete AB Mid-City $518,478.00 06-Nov-13 A 28-Feb-14 A Remove and  replace existing roadway, install new American  with Disabilities Act-compliant curb ramps. Visit www.pavinglaroads.com for additional  detail.
DPW048 Bike Rack Installation Project Federal Design ABCDE Central Business District $448,418.00 Oct-Nov-Dec 2017 Jan-Feb-Mar 2018 Installation of bike racks in various  locations.
DPW566 Blair St. (General Meyer - Tullis Dr.) City Funded Complete C New Aurora - English Turn $120,000.00 04-May-16 A 02-Jun-16 A This project includes concrete panal replacement, repair  cracks and joints, and install new ADA compliant  ramps.
DPW529 Bordeaux St. (Magazine - Camp) City Funded Complete B Uptown $75,000.00 27-Jul-15 A 14-Aug-15 A Asphalt Patching and Mill  Overlay and Drainage Improvements.
DPW507 Breakwater Drive (North Roadway - Dead End) Federal Design A West End $563,552.00 Oct-Nov-Dec 2017 Jan-Feb-Mar 2018 Re-establishment of the breakwater and may  include roadway/sidewalk construction.
DPW313 Broad and Washington Streetscape (S. Broad (Fourth - Louisiana) Washington (S. White - Dorgenois) CDBG Funded Complete B Broadmoor $330,534.86 10-Mar-14 A 18-Jul-14 A May include sidewalk or other pedestrian walkway  improvements, bikeways, traffic and pedestrian signage or signalization,  landscaping, lighting, or public art.
DPW014 Broad St. and Lafitte St Streetscape (Bienville St - Orleans Ave) CDBG Funded Complete AB Tulane - Gravier $713,315.00 01-Jun-15 A 08-Apr-16 A May include sidewalk or other  pedestrian walkway improvements, bikeways, traffic and pedestrian signage or  signalization, landscaping, lighting, or public art.
DPW563 Broad St. Corridor Bikeway Federal Planning B Mid-City $89,291.25 Jan-Feb-Mar 2017 Apr-May-Jun 2017 Installation of bicycle pavement  markings.
DPW547 Broadmoor Drainage Upgrades and Green Infrastructure Federal Design B Central City $50,992,560.00 Jul-Aug-Sep 2017 Jan-Feb-Mar 2020 This project is  intended                                                  to help alleviate  flooding by aiming to increase the capacity of the subsurface drainage between local  streets and the SWBNO SELA projects as well as by using green infrastructure  options which may include large retention/detention basins, street basins,  and streetside bioswales.
DPW016 Broadmoor Streetscape (General Pershing from Broad St. to Miro St.) CDBG Funded Complete B Broadmoor $381,439.00 23-Aug-12 A 05-Feb-13 A May include sidewalk or other  pedestrian walkway improvements, bikeways, traffic and pedestrian signage or  signalization, landscaping, lighting, or public art.
DPW361 Broadway St. (Fontainbleau - Leake) PTP Complete AB Audubon $3,074,065.00 17-Apr-13 A 22-Aug-13 A Removal  and replacement of the sidewalk intersections for the installation of the  compliant ADA ramps and the installation of the ADA ramps in the  medians.
DPW548 Brown's Dairy Truck Lane Improvements (Baronne (Erato-Thalia), Carondelet (Erato-Thalia)) Federal Complete C Central City $47,579.00 14-Apr-15 A 22-Sep-15 A The scope of work involved with this project includes  full depth roadway replacement on the truck lanes entering and exiting the  Brown's Dairy facility on Carondelet and Baronne.  Sidewalk, Driveway, and  Curb replacement is also included.
DPW417 Burdette St. (Oleander - Forshey) CDBG Funded Complete A Gert Town $31,262.50 11-Aug-14 A 13-Sep-14 A Rehabilitation of asphalt pavement including mill, patching, and 2-inch  overlay. Additional improvements include sidewalk repair, construction of ADA  ramps, installation of high-visibility crosswalks, and other roadway  striping.
DPW367 Burgundy St. (Canal - Esplanade) PTP Complete C French Quarter $1,382,353.00 16-Jul-12 A 31-Dec-12 A Remove and  replace existing roadway, install new American  with Disabilities Act-compliant curb ramps. Visit www.pavinglaroads.com for additional  detail.
DPW385 Burgundy St. (Esplanade - Elysian Fields) PTP Complete C Marigny & Bywater Neighborhoods $880,000.00 24-Mar-14 A 17-Oct-14 A Remove and  replace existing roadway, install new American  with Disabilities Act-compliant curb ramps. Visit www.pavinglaroads.com for additional  detail.
DPW440 Caffin (Chartres - St. Claude Ave.) CDBG Funded Complete E Holy Cross $366,666.67 16-Feb-15 A 18-Mar-15 A Rehabilitation of asphalt pavement including mill, patching, and 2-inch  overlay. Additional improvements include sidewalk repair, construction of ADA  ramps, installation of high-visibility crosswalks, and other roadway  striping.
DPW538 Caffin (Claiborne - Derbigny) City Funded Complete E Lower Ninth Ward $92,313.43 22-May-15 A 05-Jun-15 A Concrete panel replacement.
DPW018 Camp (Valmont - Jefferson), Chestnut/Coliseum (Valmont - Leontine), Leontine/Valmont (Mag-Prytania) City Funded Design B Uptown $9,721,674.00 Jan-Feb-Mar 2017 Apr-May-Jun 2018 Reconstruction of existing roadway, including the replacement of affected  utilities.
DPW019 Camp St. (Canal - US 90) PTP Complete B Central Business District $1,274,264.00 03-Nov-09 A 04-Dec-10 A Rehabilitation of roadway by milling existing surface and  overlay with new asphalt, including pre-milling patching repairs as well as  adjustment of utility manholes, where applicable, installation of trees, ADA  ramps and bike lane signage & striping.
DPW523 Camp St. (Felicity - Melpomene) City Funded Complete B Lower Garden District $121,596.20 29-Jul-15 A 01-Aug-15 A Asphalt Patching  and 2" Mill Overlay
DPW199 Camp St. (Louisiana - Washington Ave) City Funded Design B Touro $3,173,746.00 Apr-May-Jun 2017 Oct-Nov-Dec 2017 Reconstruction of existing roadway,  including the replacement of affected utilities.
DPW020 Canal Blvd. Reconstruction (Robert E. Lee Blvd - Amethyst St.) Federal Design D Lakeshore-LakeVista $9,611,385.00 Oct-Nov-Dec 2017 Jan-Feb-Mar 2019 Reconstruction of existing roadway,  including the replacement of affected utilities.
DPW567 Canal St. and Tunnel Repair City Funded Complete C French Quarter $1,216,750.00 06-May-16 A 14-Jun-16 A Emergency repairs to the tunnel under Canal St  and replacement of the roadway that collapsed.
DPW448 Capital Street Light Replacement Project City Funded Complete ABCDE City Wide $1,526,113.80 22-Sep-14 A 23-Jun-15 A Capital major repair of interstate lighting  and underground repairs
DPW023 Carondelet St. (Canal St - US 90) PTP Complete B Central Business District $941,878.00 03-Nov-09 A 04-Dec-10 A Rehabilitation of roadway by milling existing surface and overlay  with new asphalt, including pre-milling patching repairs as well as adjustment  of utility manholes where applicable, installation of ADA  ramps.
DPW024 Carrollton Ave  (St. Charles - Claiborne US 90) PTP Complete A Mid-City $3,439,548.00 11-Jan-10 A 14-Jul-10 A Rehabilitation of roadway by milling existing surface and  overlay with new asphalt, including pre-milling patching repairs as well as  adjustment of utility manholes, where applicable, removal & replacement of  sidewalks, installation of trees, ADA ramps and bikelane striping &  signage.
DPW027 Carrollton Ave & Palmetto / Washington Streetscapes CDBG Funded Complete AB Gert Town $396,495.41 28-May-13 A 24-Jan-14 A An enhancement project that may include: New road striping, improved curbs,  gutters and sidewalks, improvements to drainage and catch basins, installation  of new landscaping and streetlights.
DPW025 Carrollton Ave (South) (I-10 - Claiborne US 90) PTP Complete AB Mid-City $3,520,481.00 11-Jan-10 A 14-Jul-10 A Rehabilitation of roadway by milling existing surface and  overlay with new asphalt, including pre-milling patching repairs as well as  adjustment of utility manholes, where applicable, renewal & replacement of  sidewalks, installation of ADA ramps.
DPW234 Carrollton Intersection (S. Carrollton Ave. from I-10 - Palm St.) CDBG Funded Complete AB Gert Town $1,396,991.43 28-May-13 A 24-Jan-14 A Traffic signal and roadway intersection improvements
DPW029 Cartier Ave  (Mirabeau Ave - Filmore Ave) City Funded Complete D Filmore $2,425,460.15 12-Jan-15 A 21-Aug-15 A Reconstruction of existing roadway, including the replacement of affected  utilities.
PWF074 Catchbasin/Manhole Repair City Funded Complete ABCDE City Wide $6,690,206.94 30-Jun-08 A 08-Aug-10 A Repair of catchbasins and manholes damaged as a direct result of  post-Hurricane Katrina clean-up efforts.
DPW030 Catina (Mouton - Robert E Lee), Louisville (Filmore - Robert E Lee) City Funded Complete A Lakeview $4,926,828.16 22-Mar-10 A 10-Jan-11 A Reconstruction of existing roadway,  including the replacement of affected utilities.
DPW439 Chartres (Alabo - Caffin) CDBG Funded Complete E Holy Cross $366,666.67 16-Feb-15 A 18-Mar-15 A Rehabilitation of asphalt pavement including mill, patching, and 2-inch  overlay. Additional improvements include sidewalk repair, construction of ADA  ramps, installation of high-visibility crosswalks, and other roadway  striping.
DPW457 Cherokee Phase II (Benjamin St. - Pearl St.) City Funded Design A Black Pearl $436,914.23 Apr-May-Jun 2017 Jul-Aug-Sep 2017 Installing a new  subsurface storm water collection and conveyance system in a two block region of  Cherokee street for approximately 700 linear feet.
DPW034 Cherokee St (Hampson St - Freret St) City Funded Complete A East Carrollton $1,556,375.33 10-Nov-14 A 27-Apr-15 A Reconstruction of existing roadway,  including the replacement of affected utilities.
DPW365 City Park Ave. (Canal - Orleans) PTP Complete A Mid-City $1,244,264.00 04-Mar-13 A 24-Jun-13 A Remove and  replace existing roadway, install new American  with Disabilities Act-compliant curb ramps. Visit www.pavinglaroads.com for additional  detail.
DPW036 City Park Parking Lot Improvements (Marconi - Stadium Dr.) City Funded Construction A City Park $930,660.00 18-Jul-16 A Oct-Nov-Dec 2016 New parking area at Tad Gormley Stadium and expand parking area at Marconi  Drive.
DPW178 Claiborne (South) @ Toledano (Napoleon Ave - Martin  Luther King  Jr.) CDBG Funded Complete B Central City $2,166,996.34 16-May-12 A 04-Dec-13 A An enhancement project that may include: A new memorial commemorating the  contributions of nine New Orleans Civil Rights Leaders, palm tree lined walkways  from Jackson Ave to Josephine St, Lighting and landscaping in the median from  Napoleon Ave to Jackson Ave, new streetlights complete with fixtures on which to  hang decorative banners.
DPW089 Claiborne Avenue Streetscape (Cleveland St. - Gravier St.) Federal Complete B Central Business District $2,207,146.56 04-Jan-10 A 17-Sep-10 A Sidewalk and landscaping  improvements
DPW041 Common St. (Loyola Ave - S. Peters St) PTP Complete B Central Business District $1,236,691.00 03-Nov-09 A 04-Dec-10 A Rehabilitation of roadway by milling existing surface and  overlay with new asphalt, including pre-milling patching repairs as well as  adjustment of utility manholes, where applicable, removal & replacement of  sidewalks, installation of trees, ADA ramps, bikelane signage &  striping
DPW377 Congress St. (Hayne - Madrid) PTP Complete D Pontchartrain Park $487,964.00 06-Jan-14 A 16-Jul-14 A Remove and  replace existing roadway, install new American  with Disabilities Act-compliant curb ramps. Visit www.pavinglaroads.com for additional  detail.
DPW378 Congress St. (Madrid - Chef Menteur) PTP Complete D Pontchartrain Park and Gentilly Woods $1,476,057.00 06-Jan-14 A 16-Jul-14 A Remove and  replace existing roadway, install new American  with Disabilities Act-compliant curb ramps. Visit www.pavinglaroads.com for additional  detail.
DPW454 Constance St. (Jackson - Phillip) CDBG Funded Complete B Lower Garden District $46,213.54 09-Sep-15 A 18-Sep-15 A This project will accomplish the rehabilitation of  asphalt pavement including, milling, full depth patching and 2-inch overlay,  clearing and sealing of joints and curb repair.  Additional improvements  may include features to improve access for all users such as sidewalk repair,  construction of ADA ramps, installation of high-visibility crosswalks and other  roadway striping, and installation of new way finding and other street                             signage.
DPW382 CostCo Infrastructure Improvements CDBG Funded Complete AB Gert Town $2,547,915.89 29-Apr-13 A 03-Oct-13 A An enhancement project that may include: Demolition of existing frontage  roads, installation of road grading, new road striping, improved curbs,  gutters and sidewalks, improvements to drainage and catch basins,   construction of a deceleration lane on Palmetto St, warning beacons at  the Pontchartrain Expressway exit from I-10, new traffic signal at Dixon St and  Dublin St., and installation of new landscaping and  streetlights.
DPW285 Countdown Timers - Downtown City Funded Construction B Central Business District $1,319,146.00 01-Mar-16 A Jan-Feb-Mar 2017 Retrofit existing traditional  walk/stop pedestrian signals with countdown timers and adding new pedestrian  countdown signals in the Downtown area.
DPW250 Crowder Blvd (Dwyer Rd - US 90) Bikeway City Funded Complete E Read Blvd West $9,600.00 08-Dec-09 A 01-Jul-10 A Install new pavement markings and  signage
DPW368 Dauphine St. (Canal - Esplanade) PTP Complete C French Quarter $1,322,195.00 16-Jul-12 A 31-Dec-12 A Remove and  replace existing roadway, install new American  with Disabilities Act-compliant curb ramps. Visit www.pavinglaroads.com for additional  detail.
DPW420 De Armas (Hendee - Behrman) CDBG Funded Complete C Whitney $700,655.85 08-Sep-14 A 03-Oct-14 A Rehabilitation of asphalt pavement including mill, patching, and 2-inch  overlay. Additional improvements include sidewalk repair, construction of ADA  ramps, installation of high-visibility crosswalks, and other roadway  striping.
DPW545 De Armas (L.B Landry - Hendee) CDBG Funded Complete C Whitney $100,000.00 13-Aug-15 A 18-Sep-15 A Rehabilitation of asphalt pavement including mill, patching, and 2-inch  overlay. Additional improvements include sidewalk repair, construction of ADA  ramps, installation of high-visibility crosswalks, and other roadway  striping.
DPW372 Decatur St. (St Louis - Dumaine) PTP Complete C French Quarter $599,038.00 23-Jul-12 A 31-Dec-12 A Remove and  replace existing roadway, install new American  with Disabilities Act-compliant curb ramps. Visit www.pavinglaroads.com for additional  detail.
DPW532 Delachaise St. (Prytania - Coliseum) City Funded Complete B Touro $50,000.00 17-Aug-15 A 20-Aug-15 A Asphalt Patch/Mill Overlay  + Drainage Point Repair
DPW536 Delacroix Rd. (Willow Dr. - English Turn Dr.) City Funded Complete C New Aurora - English Turn $25,000.00 15-Feb-16 A 19-Feb-16 A Spread Reclaimed Asphalt Pavement.
DPW045 DeSaix Bridge over Bayou St. John City Funded Planning AD City Park $1,242,708.00 TBD TBD Bridge reconstruction
DPW525 Desoto St. (N. Dupre St. - N. White St.) City Funded Complete A Bayou St. John $69,923.70 20-Jul-15 A 29-Jul-15 A Concrete panel replacement and  installation of ADA ramps.
DPW403 Downman Rd (Babylon - Odin) PTP Complete D Pines Village $412,500.00 16-Jun-14 A 29-Sep-14 A Remove and  replace existing roadway, install new American  with Disabilities Act-compliant curb ramps. Visit www.pavinglaroads.com for additional  detail.
DPW392 Downtown Infrastructure Improvements (Dorsiere, Iberville, Julia St) Other Complete BC Central Business District $5,195,271.49 24-Jul-13 A 20-Mar-15 A The scope of work in the French Quarter includes resurfacing Dorsiere St.  from Iberville to Canal streets, and Iberville St. from North Peters to North  Rampart streets with concrete. These additional infrastructure improvements will  include new Americans with Disabilities Act-compliant curb ramps, repairs to  damaged sidewalks and driveway aprons, drainage point repairs, new striping and  crosswalks, repairs to damaged street lights including conversion of  non-historic streetlights to LED lights, signage improvements, and improved  sanitation practices.   The scope of work in the CBD includes resurfacing Julia St. from Convention  Center Blvd. to Loyola Ave. with concrete. These additional infrastructure  improvements will include new sidewalks and driveway aprons, Americans with  Disabilities Act-compliant curb ramps, drainage point repairs, new striping and  crosswalks, signage improvements, and improved sanitation practices.
DPW570 Downtown Traffic Condition Analysis Other Construction BC Central Business District $628,957.00 12-Apr-16 A Apr-May-Jun 2017 0
DPW321 Drain Point Repair Services City Funded Complete ABCDE City Wide $6,504,749.39 22-Feb-10 A 01-Oct-11 A Patching repairs of streets and  sidewalks damaged by storm waters and debris removal.
DPW293 Drainage Master Plan Study CDBG Funded Complete ABCDE City Wide $1,996,459.00   30-Apr-12 A Conduct field investigations and survey of major drainage  facilities.  Review and update existing Geographic Information System (GIS)  data.  Review and assess current data management, develop model for  new system.  Develop standards and guidelines, and maintenance  procedures.
DPW411 Drexel (Short - S. Genois) CDBG Funded Complete A Gert Town $232,300.75 27-Jun-14 A 25-Jul-14 A Rehabilitation of asphalt pavement including mill, patching, and 2-inch  overlay. Additional improvements include sidewalk repair, construction of ADA  ramps, installation of high-visibility crosswalks, and other roadway  striping.
DPW050 Earhart Blvd Segment I (Hamilton St - Fern St) Federal Complete AB Gert Town $16,525,567.03 30-Nov-09 A 10-Oct-11 A Reconstruction of existing roadway,  including the replacement of affected utilities.
DPW329 Edgelake Court (Crowder Rd - Hayne Blvd) City Funded Complete E Little Woods $291,753.17 08-Apr-13 A 29-May-13 A Asphalt pavement, base repair and curb  replacement.
DPW546 Elmira (Diana - Newton) CDBG Funded Complete C McDonogh $50,000.00 09-Sep-15 A 18-Sep-15 A Rehabilitation of asphalt pavement including mill, patching, and 2-inch  overlay. Additional improvements include sidewalk repair, construction of ADA  ramps, installation of high-visibility crosswalks, and other roadway  striping.
DPW421 Elmira (Park - Diana) CDBG Funded Complete C McDonogh $700,655.85 08-Sep-14 A 06-Oct-14 A Rehabilitation of asphalt pavement including mill, patching, and 2-inch  overlay. Additional improvements include sidewalk repair, construction of ADA  ramps, installation of high-visibility crosswalks, and other roadway  striping.
DPW052 Elysian Fields (Lakeshore Dr. - Gentilly Blvd. / US 90) PTP Complete D Gentilly $1,597,583.00 20-Nov-09 A 12-Apr-12 A Rehabilitation of roadway by milling existing surface and overlay with new  asphalt, including pre-milling patching repairs as well as adjustment of utility  manholes, where applicable, removal & replacement of concrete roadway from  Lakeshore Dr. - Robert E Lee Blvd, removal & replacement of sidewalk,  installation of ADA ramps, bike lane striping & signage.
DPW314 Esperanza Charter School - Safe Routes to School (K09-886)  State ID 737-99-1024 City Funded Construction A Mid-City $275,956.00 26-Jan-15 A Jan-Feb-Mar 2017 Construct 16 curb extensions, sidewalk repair, 2 bike  racks, pavement markings, countdown pedestrian signals and signs near the  Esperanza Charter School.  State Project No. 737-36-0022 and Federal  Project No. SRS-3609 (509).
DPW396 Esplanade Ave (Claiborne - N. Rampart) Bikeway City Funded Complete CD Treme - Lafitte $12,000.00 22-Aug-13 A 16-Jan-14 A Install new pavement markings and  signage
DPW366 Esplanade Ave. (Moss - N. Claiborne) PTP Complete CD Treme - Lafitte $3,019,171.00 04-Mar-13 A 24-Jun-13 A Remove and  replace existing roadway, install new American  with Disabilities Act-compliant curb ramps. Visit www.pavinglaroads.com for additional  detail.
DPW369 Esplanade Ave. (N Rampart - N Peters) PTP Complete C French Quarter $1,602,028.00 16-Jul-12 A 31-Dec-12 A Remove and  replace existing roadway, install new American  with Disabilities Act-compliant curb ramps. Visit www.pavinglaroads.com for additional  detail.
DPW055 Filmore Ave (Bayou St. John - Elysian Fields Ave) Federal Complete D Filmore $2,743,221.00 20-Nov-09 A 31-May-11 A Rehabilitation of roadway by milling existing surface and  overlay with new asphalt, including pre-milling patching repairs as well as  adjustment of utility manholes, where applicable, removal & replacement of  sidewalk, installation of ADA ramps, bike lane striping &  signage.
DPW352 Filmore Ave. (Marconi - Wisner) PTP Complete A City Park $512,344.00 17-Jun-13 A 19-Sep-13 A Remove and  replace existing roadway, install new American  with Disabilities Act-compliant curb ramps. Visit www.pavinglaroads.com for additional  detail.
DPW351 Filmore Ave. (West End - Canal) PTP Complete A Lakeview $512,344.00 17-Jun-13 A 19-Sep-13 A Remove and  replace existing roadway, install new American  with Disabilities Act-compliant curb ramps. Visit www.pavinglaroads.com for additional  detail.
DPW056 Filmore Bridge over Bayou St. John City Funded Planning AD City Park $1,050,000.00 TBD TBD Bridge  reconstruction
DPW058 Fleur de Lis Phase II (Veterans Blvd - Harrison Ave) Federal Complete A West End $12,445,648.27 10-Dec-09 A 04-Mar-11 A Reconstruction of existing roadway,  including the replacement of affected utilities.
DPW059 Fleur de Lis Phase III (30th - Hammond Hwy) Federal Bid & Award A West End $16,762,886.00 Jan-Feb-Mar 2017 Jan-Feb-Mar 2018 Reconstruction of existing roadway, including the replacement of affected  utilities.
DPW511 Fontainebleau and S. Lopez City Funded Complete B Broadmoor $84,821.90 03-Nov-14 A 31-Dec-14 A Concrete panel replacement and  installation of ADA ramps.
DPW359 Fontainebleau Dr. (Broadway - Nashville) PTP Complete AB Marlyville & Fontainbleau $439,152.00 23-Aug-13 A 06-Nov-13 A Remove and  replace existing roadway, install new American  with Disabilities Act-compliant curb ramps. Visit www.pavinglaroads.com for additional  detail.
DPW413 Forshey (S. Carrollton Ave. - Fern) CDBG Funded Complete A Gert Town $55,376.25 25-Aug-14 A 15-Sep-14 A Rehabilitation of asphalt pavement including mill, patching, and 2-inch  overlay. Additional improvements include sidewalk repair, construction of ADA  ramps, installation of high-visibility crosswalks, and other roadway  striping.
DPW340 Forstall St. (Douglass St. - N. Claiborne) PTP Complete E Lower Ninth Ward $677,527.00 09-Jul-12 A 01-Nov-12 A Remove and  replace existing roadway, install new American  with Disabilities Act-compliant curb ramps. Visit www.pavinglaroads.com for additional  detail.
DPW506 Franklin Ave (LC Simon - Lakeshore) PTP Complete D Lake Terrace and Oaks $897,286.39 08-Apr-16 A 03-May-16 A Remove and replace failed concrete  pavement as required, remove and replace concrete curb as required, and  permanent striping. Visit www.pavinglaroads.com for additional  detail.
DPW350 Franklin Ave. (Filmore - Gentilly) PTP Complete D Gentilly Terrace $1,451,625.00 17-Jun-13 A 19-Sep-13 A Remove and  replace existing roadway, install new American  with Disabilities Act-compliant curb ramps. Visit www.pavinglaroads.com for additional  detail.
DPW571 French Quarter Sidewalk Improvement Program Other Construction C French Quarter $1,185,645.10 31-May-16 A Oct-Nov-Dec 2016 Project includes street light repairs, pavement  assessment projects, emergency sidewalk and infrastructure                                                                   repairs.
DPW063 Freret St Streetscape (Napoleon Ave  - Jefferson Ave) CDBG Funded Complete B Freret $1,303,095.12 04-Nov-13 A 12-Mar-14 A May include sidewalk or other  pedestrian walkway improvements, bikeways, traffic and pedestrian signage or  signalization, landscaping, lighting, or public art.
DPW357 Freret St. (Louisiana - Jefferson) PTP Complete B Freret $1,375,469.00 23-Aug-13 A 06-Nov-13 A Remove and  replace existing roadway, install new American  with Disabilities Act-compliant curb ramps. Visit www.pavinglaroads.com for additional  detail.
DPW278 Galvez ( Elysian Fields - Orleans Ave ) Bikeway City Funded Complete D Treme - Lafitte $11,500.00 11-Jul-14 A 19-Dec-14 A Install new pavement markings and  signage
DPW066 Galvez (Poydras - Orleans Ave.) PTP Complete ACD Mid-City $808,999.00 27-Feb-10 A 30-Jun-11 A Rehabilitation of roadway by milling  existing surface and overlay with new asphalt, including pre-milling patching  repairs as well as adjustment of utility manholes, where applicable.
DPW068 Gardena Dr (St. Bernard Ave - Paris Ave.) City Funded Design D Filmore $4,639,850.00 Apr-May-Jun 2017 Jul-Aug-Sep 2017 Reconstruction of existing roadway,  including the replacement of affected utilities.
DPW389 General DeGaulle Dr (Woodland - Holiday) PTP Complete C Old Aurora $1,508,000.00 18-Aug-14 A 05-Dec-14 A Remove and  replace existing roadway, install new American  with Disabilities Act-compliant curb ramps. Visit www.pavinglaroads.com for additional  detail.
DPW054 General Meyer Ave Streetscape (Hendee St - Odeon Ave) Phase I CDBG Funded Complete C Behrman $684,906.37 01-Feb-16 A 02-Mar-16 A May include sidewalk or other  pedestrian walkway improvements, bikeways, traffic and pedestrian signage or  signalization, landscaping, lighting, or public art.
DPW349 Gentilly Blvd. (Paris - Broad) PTP Complete AD Fairgrounds $2,415,337.00 01-Jun-13 A 17-Oct-13 A Remove and  replace existing roadway, install new American  with Disabilities Act-compliant curb ramps. Visit www.pavinglaroads.com for additional  detail.
DPW070 Gentilly Minor Streets - Caton (Gentilly Blvd. - Norman Mayer Ave.), Touro (Caton - Senate) CDBG Funded Complete D Dillard $509,750.77 16-Sep-13 A 23-Jan-14 A Improvements to various  minor streets, which may include reconstruction and/or milling and overlay.
DPW071 Gentilly Streetscape (Caton, Gentilly, Elysian Fields) CDBG Funded Complete D Dillard $615,749.48 18-Nov-13 A 27-Jun-14 A May include sidewalk or other pedestrian walkway improvements, bikeways, traffic  and pedestrian signage or signalization, landscaping, lighting, or public art.
DPW429 Georgia St. (Amazon - Gen DeGaulle) CDBG Funded Complete C Tall Timbers - Brechtel $35,002.00 29-Jul-14 A 20-Aug-14 A Rehabilitation of asphalt pavement including mill, patching, and 2-inch  overlay. Additional improvements include sidewalk repair, construction of ADA  ramps, installation of high-visibility crosswalks, and other roadway  striping.
DPW272 Girod St.  ( Loyola Ave - S. Peters St)  Bikeway City Funded Complete B Central Business District $6,000.00 22-Aug-13 A 22-Oct-13 A Install new pavement markings and  signage
DPW074 Girod St. (Loyola Ave - S. Peters St) PTP Complete B Central Business District $870,959.00 03-Nov-09 A 04-Dec-10 A Rehabilitation of roadway by milling existing surface and  overlay with new asphalt, including pre-milling patching repairs as well as  adjustment of utility manholes, where applicable, installation of ADA  ramps.
DPW075 Gordon (Chartres - St. Claude), Flood (Peters - St. Claude) City Funded Complete E Lower Ninth Ward $6,009,589.57 01-Apr-11 A 01-Jun-12 A Reconstruction of existing roadway,  including the replacement of affected utilities.
DPW076 Gravier St (Galvez - Broad) City Funded Construction B Tulane - Gravier $5,354,094.70 04-Jan-16 A Jan-Feb-Mar 2017 Reconstruction of existing roadway,  including the replacement of affected utilities.
DPW077 Gravier St. (Loyola Ave - S. Peters St) PTP Complete B Central Business District $585,378.00 03-Nov-09 A 04-Dec-10 A Rehabilitation of roadway by milling existing surface and  overlay with new asphalt, including pre-milling patching repairs as well as  adjustment of utility manholes, where applicable, installation of ADA  ramps.
DPW528 Green St (Joliet - Dante) City Funded Complete A Leonidas $65,000.00 20-Jul-15 A 07-Aug-15 A Asphalt  Patching and Mill Overlay
DPW550 Hagan-Lafitte (Bayou St. John) Drainage Upgrades Federal Design A Bayou St. John $7,000,000.00 Jan-Feb-Mar 2018 Jul-Aug-Sep 2018 This project  is intended to help alleviate flooding by increasing the capacity of subsurface  drainage between local streets and trunk lines, potentially utilizing the  St. Louis Canal, as well as by using green infrastructure options which may include  retention/detention basins, street basins, rain gardens, and street side  bioswales.
DPW081 Harrison Ave Bridge over Bayou St. John (Eastbound) City Funded Complete AD City Park $709,610.00 06-Apr-10 A 03-Oct-11 A Bridge  reconstruction
DPW082 Harrison Ave Bridge over Bayou St. John (Westbound) Federal Complete AD City Park $709,610.00 06-Apr-10 A 03-Oct-11 A Bridge reconstruction
DPW083 Harrison Ave Streetscape (Canal St - Orleans Ave) CDBG Funded Complete A Lakeview $4,013,681.82 18-Mar-13 A 12-Feb-14 A An enhancement project that may include: Additional trees and shrubbery, new  brick-paved sidewalks, additional lighting, fresh crosswalk markings, and  improved irrigation.
DPW344 Hayne Blvd. (Press - Congress) PTP Complete D Pontchartrain Park $480,958.00 16-Jul-12 A 01-Nov-12 A Remove and  replace existing roadway, install new American  with Disabilities Act-compliant curb ramps. Visit www.pavinglaroads.com for additional  detail.
DPW424 Hendee (Mardi Gras - Ptolemy) CDBG Funded Complete C Whitney $91,525.60 13-Oct-14 A 07-Nov-14 A Rehabilitation of concrete pavement  including panel patching/replacements, clearing and sealing of joints, crack  sealing and curb repair. Additional improvements include sidewalk repair,  construction of ADA ramps, installation of high-visibility crosswalks and other  roadway striping.
DPW425 Hendee (Ptolemy - Opelousas) CDBG Funded Complete C Whitney $700,655.85 05-Aug-14 A 03-Sep-14 A Rehabilitation of asphalt pavement including mill, patching, and 2-inch  overlay. Additional improvements include sidewalk repair, construction of ADA  ramps, installation of high-visibility crosswalks, and other roadway  striping.
DPW085 Holiday Dr  (General Meyer Ave - MacArthur) City Funded Complete C Old Aurora $3,255,253.27 01-Jun-11 A 07-Feb-12 A Rehabilitation of roadway by milling  existing surface and overlay with new asphalt, including pre-milling patching  repairs as well as adjustment of utility manholes, where applicable.
DPW086 Holiday Dr (MacArthur - Behrman) City Funded Complete C Old Aurora $2,566,914.03 15-Nov-11 A 16-Feb-12 A Rehabilitation of roadway by milling  existing surface and overlay with new asphalt, including pre-milling patching  repairs as well as adjustment of utility manholes, where applicable.
DPW245 Holy Cross Roadway Improvements - Douglass St., Andry St., N. Peters St. CDBG Funded Complete E Lower Ninth Ward $617,253.32 11-Jan-10 A 12-Oct-10 A Improvements to various  minor streets, which may include reconstruction and/or milling and overlay.
DPW087 Homedale (Canal - West End), Center (33rd - Tacoma), Milne (Homedale - Florida), Walker (Marshal-Orl City Funded Design A Lakeview $14,011,948.00 Jan-Feb-Mar 2017 Jul-Aug-Sep 2018 Reconstruction of existing roadway,  including the replacement of affected utilities.
DPW516 Horizon Dr. (Horizon Ct. - Explorers Ave) City Funded Complete E Village de Lest $20,604.00 03-Nov-14 A 31-Dec-14 A Concrete panel replacement and  installation of ADA ramps.
DPW088 Howard Avenue Ext. (Loyola Ave  - LaSalle St) Federal Design B Central Business District $6,762,202.00 Jan-Feb-Mar 2017 Apr-May-Jun 2017 Reconstruction of existing roadway,  including the replacement of affected utilities.
DPW243 Huntlee Dr. (General  DeGaulle - Berkley Dr) City Funded Complete C Old Aurora $1,496,930.84 27-Apr-15 A 09-Nov-15 A Reconstruction of existing roadway, including the replacement of affected  utilities.
DPW404 Hurricane Isaac Repairs City Funded Complete ABCDE City Wide $506,899.39 12-Dec-13 A 30-May-14 A The project  will consist of restoring damaged concrete sidewalks, concrete driveways,  barrier curbs, mountable curbs, and surrounding earth displaced by fallen trees  and other disaster related occurrences within the City right of way as a result  of Hurricane Isaac.
DPW430 Idaho St. (Wabash - Gen DeGaulle) CDBG Funded Complete C Tall Timbers - Brechtel $98,583.38 30-Jul-14 A 20-Aug-14 A Rehabilitation of asphalt pavement including mill, patching, and 2-inch  overlay. Additional improvements include sidewalk repair, construction of ADA  ramps, installation of high-visibility crosswalks, and other roadway  striping.
DPW431 Illinois St. (Gen DeGaulle - Amazon) CDBG Funded Complete C Tall Timbers - Brechtel $56,082.13 29-Jul-14 A 20-Aug-14 A Rehabilitation of asphalt pavement including mill, patching, and 2-inch  overlay. Additional improvements include sidewalk repair, construction of ADA  ramps, installation of high-visibility crosswalks, and other roadway  striping.
DPW452 Indiana St. (General DeGaulle - Amazon) CDBG Funded Complete C Tall Timbers - Brechtel $74,061.26 09-Sep-15 A 18-Sep-15 A This project will accomplish the rehabilitation of  asphalt pavement including, milling, full depth patching and 2-inch overlay,  clearing and sealing of joints and curb repair.  Additional improvements  may include features to improve access for all users such as sidewalk repair, construction of ADA ramps,  installation of high-visibility crosswalks and other roadway striping, and  installation of new way finding and other street  signage.
DPW315 International School of LA - Safe Routes to School State ID 737-99-1024 City Funded Construction B Lower Garden District $259,624.00 26-Jan-15 A Jan-Feb-Mar 2017 Construct curb extensions with ADA compliant ramps at  various locations, install countdown pedestrian signals, pavement markings for  crosswalks at various locations, and miscellaneous markings and signs all in the  immediate vicinity of the International School of LA.  State Project No.  737-36-0019.
DPW456 Isaac Drainage Point Repairs CDBG Funded Bid & Award ABCDE City Wide $5,100,000.00 Jan-Feb-Mar 2017 Oct-Nov-Dec 2017 The intent of this project is to improve drainage  conditions throughout the City of New Orleans.     Based on  311 calls, various other complaints received by DPW, and pre-existing known  issues after Hurricane Isaac, the scope of work includes, but not limited to,  the following:  cleaning of existing catch basins and drain lines,  installation of new drain lines, catch basins, manholes, and  point repairs to existing drain lines.  Pavement and/or sidewalk  repairs may be necessary above new drain line  installations.
DPW442 Jackson Ave. (S. Claiborne - Tchoupitoulas) CDBG Funded Construction B Central City, Lower Garden District, St. Thomas Dev $3,750,000.00 06-Sep-16 A Jan-Feb-Mar 2017 #N/A
DPW090 Jackson Ave. (S. Claiborne Ave - S. Galvez St) City Funded Construction B Central City $3,842,008.00 18-Apr-16 A Oct-Nov-Dec 2016 Reconstruction of existing roadway,  including the replacement of affected utilities
DPW283 Jefferson Ave. (Claiborne - Tchoupitoulas ) Bikeway City Funded Design A Audubon $12,750.00 Oct-Nov-Dec 2018 Jan-Feb-Mar 2019 Install new pavement markings and  signage
DPW407 Jefferson Davis Bike Path (Gravier St. - Orleans Ave.) City Funded Complete BD Tulane Gravier, Treme-Lafitte $111,448.40 08-Jun-15 A 20-Jul-15 A Work will  include replacement of concrete panels, and reconstruction of ramps, including  removal of the existing ramp blocks and installation of ADA-compliant detectable  warnings.  Other improvements include re-grading the ground adjacent the  trail, and replacement of failing sidewalks connecting to the  path.
DPW554 Joe W. Brown Park Bridge Federal Design E Read Blvd East $941,000.00 Jan-Feb-Mar 2017 Jul-Aug-Sep 2017 Reconstruction of existing bridge.
DPW562 Joe W. Brown Park Pavement Federal Planning E Read Blvd East $992,287.47 Jan-Feb-Mar 2017 Jul-Aug-Sep 2017 Scope of  work includes       pavement and curb replacement.
DPW539 Kabel Dr. (MacArthur Blvd. - Herchel St.) City Funded Complete C Old Aurora $98,481.01 30-May-15 A 13-Jun-15 A Concrete panel replacement.
DPW557 Kentucky St. (N. Robertson - Burgundy/Dead End) CDBG Funded Construction CD Bywater $360,000.00 01-Aug-16 A Oct-Nov-Dec 2016 This project will accomplish the rehabilitation of  asphalt pavement including, milling, full depth patching and 2-inch overlay,  clearing and sealing of joints and curb repair. Additional improvements may  include features to improve access for all users such as sidewalk repair, construction of ADA ramps,  installation of high-visibility crosswalks and other roadway striping, and  installation of new way finding and other street  signage.
DPW094 Lafitte Greenway Bicycle/Pedestrian Path - (N. Alexander- Basin) CDBG Funded Construction ACD Treme - Lafitte $9,082,631.68 20-Mar-14 A Oct-Nov-Dec 2016 Includes sidewalk and pedestrian  walkway improvements, bikeways, traffic and pedestrian signage, landscaping,  lighting, and public art.
DPW095 Lafitte Greenway Corridor  Federal Design AB Bayou St. John $435,068.07 Jul-Aug-Sep 2018 Oct-Nov-Dec 2018 Construction of a new  bikepath.
DPW432 Laharpe St. (St. Bernard Ave - N. Claiborne) CDBG Funded Complete D Seventh Ward $77,149.88 08-Aug-14 A 29-Aug-14 A Rehabilitation of asphalt pavement including mill, patching, and 2-inch  overlay. Additional improvements include sidewalk repair, construction of ADA  ramps, installation of high-visibility crosswalks, and other roadway  striping.
DPW515 Lake Forest Blvd. (Holley Ln. - Samovar Dr.) City Funded Complete E Little Woods $62,258.30 03-Nov-14 A 31-Dec-14 A Concrete panel replacement and  installation of ADA ramps.
DPW096 Lake Forest Blvd. Widening (Eastover Dr - I-510) Federal Construction E Read Blvd East $2,202,360.00 28-Sep-16 A Jan-Feb-Mar 2017 Widening of existing roadway,  including the replacement of affected utilities.
DPW098 Lakefront/Holy Cross Traffic Signals Federal Complete A Holy Cross $6,683,622.50 17-Jan-12 A 08-Mar-13 A Traffic signal  improvements
DPW551 Lakeview Drainage Upgrades Federal Design A Lakeview $5,000,000.00 Jan-Feb-Mar 2018 Oct-Nov-Dec 2018 This project  is intended to help alleviate flooding by increasing the capacity of subsurface  drainage between local streets and trunk lines as well as by using green  infrastructure options which may include green alleys, retention/detention basins,  street basins, rain gardens, and street side  bioswales.
DPW428 Lamarque (LB Landry - Sumner) CDBG Funded Complete C Whitney $207,688.25 04-Aug-14 A 29-Aug-14 A Rehabilitation of asphalt pavement including mill, patching, and 2-inch  overlay. Additional improvements include sidewalk repair, construction of ADA  ramps, installation of high-visibility crosswalks, and other roadway  striping.
DPW100 LaSalle St (Poydras - Tulane Ave US 61) PTP Complete B Uptown $741,349.00 03-Nov-09 A 04-Dec-10 A Rehabilitation of roadway by milling existing surface and  overlay with new asphalt, including pre-milling patching repairs as well as  adjustment of utility manholes, where applicable, removal & replacement of  sidewalks, installation of trees, ADA ramps, bike lane striping &  signage.
DPW505 LB Landry Ave (JP Line - Mardi Gras) PTP Complete C Fisher Development $1,499,560.00 04-Jan-16 A 03-Jun-16 A Cold plane  existing asphalt pavement 2” minimum thickness, concrete/asphalt pavement base  repair/replacement as required, concrete curb removal and replacement as  required, resurface roadway with 2” minimum thickness superpave asphalt, and  permanent striping. Visit www.pavinglaroads.com     for additional detail.
DPW101 LeBoeuf (Patterson - Opelousas), Sumner (Newton - Opelousas), Slidell (Whitney - Sumner) City Funded Complete C U.S. Naval Base $4,537,479.14 07-Feb-11 A 22-Dec-11 A Reconstruction of existing roadway, including the  replacement of affected utilities.
DPW447 LED Street Lighting City Funded Complete ABCDE City Wide $14,033,420.50 30-Jun-14 A 20-Jun-15 A Conversion of old streetlights into new LED street lights throughout the  city.
DPW543 Lennox Blvd. (Everglades - Kings Canyon Dr.) City Funded Complete C Tall Timbers - Brechtel $200,000.00 10-Aug-15 A 25-Sep-15 A Concrete panel replacement.
DPW555 Leon C Simon (Robert E. Lee - London Canal) City Funded Complete D Lake Terrace and Oaks $150,000.00 02-Oct-15 A 24-Oct-15 A Spread Reclaimed Asphalt Pavement.
DPW535 Leon C Simon at Press Dr City Funded Complete D Lake Terrace and Oaks $100,000.00 18-Sep-15 A 30-Oct-15 A Spread Reclaimed Asphalt Pavement.
DPW102 Leon C. Simon Dr (London Canal - Elysian Fields Ave) PTP Complete D Lake Terrace and Oaks $1,208,379.00 20-Nov-09 A 18-Apr-11 A Rehabilitation of roadway by milling existing surface and  overlay with new asphalt, including pre-milling patching repairs as well as  adjustment of utility manholes, where applicable, installation of ADA ramps,  bike lane striping & signage.
DPW360 Leonidas St. (Palmetto - Earhart) PTP Complete A Hollygrove $426,936.00 17-Apr-13 A 22-Aug-13 A Removal  and replacement of the sidewalk intersections for the installation of the  compliant ADA ramps and the installation of the ADA ramps in the  medians.
DPW524 Lepage St. (Esplanade - N. White St.) City Funded Complete A Fairgrounds $92,726.70 20-Jul-15 A 29-Jul-15 A Asphalt  Patching and Mill Overlay
DPW451 Louisa/Higgins Intersection CDBG Funded Complete D Desire Area $399,976.70 27-Feb-15 A 13-Mar-15 A This project will accomplish the  rehabilitation of concrete pavement including panel patching/replacement,  cleaning and sealing of joints, crack sealing, curb repair, and  reconstruction/adjustment to existing catch basins and manholes.   Additional improvements may include features to improve access for all users  such as sidewalk repair, construction of ADA ramps, installation of  high-visibility crosswalk and other roadway striping, and installation of new  way finding and other street signage.
DPW282 Louisiana Ave ( St. Charles - Magazine) Bikeway City Funded Design B Touro $14,000.00 Oct-Nov-Dec 2019 Oct-Nov-Dec 2019 Install new pavement markings and  signage
DPW542 Louisville and Bragg City Funded Complete A Lakeview $60,647.62 22-Jul-15 A 04-Aug-15 A Concrete panel replacement and manhole adjustments.
DPW292 Lower Ninth Ward Pilot Streets - Make It Right City Funded Complete E Lower Ninth Ward $2,933,000.00 11-Jun-12 A 24-Sep-12 A Reconstruction of existing roadway, including the  replacement of affected utilities. Streets include Deslonde St from N.  Derbigny to N. Prieur St., N. Derbigny St. from Deslonde St. to Reynes St., N.  Prieur St. from Deslonde St. to Reynes St., Tennessee St. from Derbigny St. to Reynes St. (Sidewalks and driveway  aprons only).
DPW106 Lower Ninth Ward Streetscape Phase I (N. Claiborne - Andry to Lamanche)(St. Claude-Bridge to Egania) CDBG Funded Complete E Lower Ninth Ward $1,369,066.94 01-Jun-12 A 18-Nov-12 A An enhancement project that may include: Sidewalk  and ADA-compliant curb ramps, landscaping, lighting, public art space,  and minor utility modifications and improvements.
DPW393 Lower Ninth Ward Streetscape Phase II (N. Claiborne -  Lamanche - Tennessee) CDBG Funded Complete E Lower Ninth Ward $655,748.05 29-Jun-15 A 10-May-16 A An enhancement project that may include: Sidewalk  and ADA-compliant curb ramps, landscaping, lighting, public art space,  and minor utility modifications and improvements.
DPW533 Loyola (Napoleon - Cadiz) City Funded Complete B Uptown $70,000.00 11-Aug-15 A 14-Aug-15 A Asphalt Patch/Mill Overlay  + Drainage Point Repair
DPW108 Loyola Ave. (Canal St. - US 90) PTP Complete B Central Business District $3,584,539.00 03-Nov-09 A 04-Dec-10 A Rehabilitation of roadway by milling existing surface and  overlay with new asphalt, including pre-milling patching repairs as well as  adjustment of utility manholes, where applicable, removal & replacement of  sidewalks, installation of trees, ADA ramps, bike lane striping &  signage.
DPW399 MacArthur Blvd (Gen DeGaulle - Kabel) PTP Complete C Old Aurora $1,312,211.73 05-Jan-15 A 06-Jun-15 A Remove and  replace existing roadway, install new American  with Disabilities Act-compliant curb ramps. Visit www.pavinglaroads.com for additional  detail.
DPW113 Magazine St. (Canal - US 90) PTP Complete B Central Business District $1,066,407.00 03-Nov-09 A 25-Aug-10 A Rehabilitation of roadway by milling existing surface and  overlay with new asphalt, including pre-milling patching repairs as well as  adjustment of utility manholes, where applicable, removal & replacement of  sidewalks, installation of trees, ADA ramps, bike lane striping &  signage.
DPW110 Magazine St. (St. Joseph St - Calliope St) Federal Complete B Central Business District $4,952,342.97 29-Jun-09 A 13-May-10 A Sidewalk and landscaping  improvements
DPW114 Magazine St. (US 90B - Nashville) PTP Complete AB Uptown $3,373,617.00 04-Jan-11 A 10-Nov-11 A Rehabilitation of roadway by milling existing surface and  overlay with new asphalt, including pre-milling patching repairs as well as  adjustment of utility manholes, where applicable, installation of ADA ramps  including  street names and bikelane striping & signage, removal &  replacement of sidewalks.
DPW112 Magazine St. Phase I (Nashville Ave - East Dr.) Federal Design A Audubon $5,936,335.00 Jul-Aug-Sep 2018 Jul-Aug-Sep 2019 Reconstruction of existing roadway,  including the replacement of affected utilities.
DPW111 Magazine St. Phase II (East Dr. - Broadway) Federal Design A Audubon $9,893,912.00 Jan-Feb-Mar 2018 Jan-Feb-Mar 2019 Reconstruction of existing roadway,  including the replacement of affected utilities.
DPW391 Magnolia Converted Ped Bridge Rehabilitation Federal Design A Bayou St. John $954,400.00 Apr-May-Jun 2017 Oct-Nov-Dec 2017 Bridge refurbishment that may include  cleaning and painting the bridge superstructure and decking, seal cracks in the  bridge's sub-structure, and replace decking, beams, and other structure components.
DPW419 Magnolia Market Place Streetscape (Washington, Toledano, Claiborne) City Funded Complete B Central City $112,708.10 09-Mar-15 A 11-Dec-15 A An enhancement project that may  include: Sidewalk and ADA-compliant curb ramps, landscaping, lighting, public  art space, and minor utility modifications and improvements.
DPW249 Marconi Blvd. (Robert E. Lee - Norfolk Southern Railroad) Bikeways City Funded Complete AC City Park $24,750.00 08-Dec-09 A 16-Jun-10 A Install new pavement markings and  signage
DPW572 Marconi Dr (City Park Ave. - I-610) Federal Planning A City Park $2,407,908.91 Jan-Feb-Mar 2018 Jul-Aug-Sep 2018 Remove and replace  existing roadway, install new American with  Disabilities Act-compliant curb ramps
DPW118 Martin Bridge over Morrison Federal Complete E Little Woods $1,188,700.00 02-Nov-11 A 28-Jun-12 A Bridge  reconstruction
DPW263 Martin Luther King Blvd ( Claiborne Ave - Broad St ) Bikeway City Funded Complete B B. W. Cooper $11,614.60 22-Aug-13 A 21-Oct-13 A Install new pavement markings and  signage
DPW573 Martin Luther King Blvd (St. Charles - S. Claiborne) Federal Planning B Central City $4,891,001.90 Jan-Feb-Mar 2018 Jul-Aug-Sep 2018 Remove and replace  existing roadway, install new American with  Disabilities Act-compliant curb ramps
DPW395 Martin Luther King Blvd (Washington - Earhart) Bikeway City Funded Complete B Gert Town $5,000.00 22-Aug-13 A 17-Dec-13 A Install new pavement markings and  signage
DPW346 Mayo Rd. (Hayne - Morrison) PTP Complete E Little Woods $601,198.00 16-Jul-12 A 01-Nov-12 A Remove and  replace existing roadway, install new American  with Disabilities Act-compliant curb ramps. Visit www.pavinglaroads.com for additional  detail.
DPW347 Mayo Rd. (Morrison - I-10) PTP Complete E Little Woods $360,719.00 03-Aug-12 A 01-Nov-12 A Remove and  replace existing roadway, install new American  with Disabilities Act-compliant curb ramps. Visit www.pavinglaroads.com for additional  detail.
DPW397 Mercedes St (MacArthur - Herschel) PTP Complete C Behrman $232,000.00 08-Apr-14 A 27-Jun-14 A Remove and  replace existing roadway, install new American  with Disabilities Act-compliant curb ramps. Visit www.pavinglaroads.com for additional  detail.
DPW120 Michoud Blvd (Chef Menteur Blvd - Dwyer Rd) City Funded Bid & Award E Village de Lest $3,782,476.00 Jan-Feb-Mar 2017 Oct-Nov-Dec 2017 Removal of existing roadways and replace with  new hot mix asphalt roadways including new concrete curb and gutter bottom,  rehabilitation of water and drain lines, constructing driveways, sidewalks and  handicap ramps, and all work incidental to the project as shown on the plans or  as directed by the Engineer in the field.
DPW142 Michoud Front Door Infrastructure Improvements (Old Gentilly Road from I-510 - Chef Menteur Highway) CDBG Funded Complete E Viavant $5,500,760.07 13-Oct-14 A 07-Oct-15 A An enhancement project that may  include: Construction of both new asphalt, and concrete roadways and appropriate  striping, repair of existing roadways, landscaping, install and improved  lighting, improved drainage, and intersection improvements at  Chef Menteur and Almonaster Blvd.
DPW128 Mirabeau Ave (Bayou St. John - Elysian Fields Ave) PTP Complete D Filmore $2,950,864.00 20-Nov-09 A 02-May-11 A Rehabilitation of roadway by milling existing surface and  overlay with new asphalt, including pre-milling patching repairs as well as  adjustment of utility manholes, where applicable, removal & replacement of  sidewalk, installation of ADA ramps, bike lane striping &  signage.
DPW517 Mirabeau Garden Stormwater Management and Flood Mitigation Federal Design D Filmore $15,000,000.00 Jan-Feb-Mar 2018 Apr-May-Jun 2019 The project is intended to feature  innovative stormwater management best management practices in order to redirect,  capture, filter, and temporarily store large volumes of stormwater. Features  that may be considered for this property include but are not limited to a  connection to the existing drainage trunk line, a solar-powered pumping  facility, a multi-use building to house ongoing educational programming, a  wetland, a woodland, channels and bioswales, athletic fields, educational and  recreational walks, and a greywater and blackwater purification system. Specific  site features may include recreational and/or scientific/educational use.  The project’s purpose is to improve the  efficacy of the existing drainage infrastructure in Gentilly, to mitigate  flooding of the neighborhood’s streets and properties to the greatest extent  possible, and to substantially reduce the volume of, and increase the quality of  stormwater entering Drainage Pump Station 4.
DPW277 Miro St ( Elysian Fields Ave - Orleans Ave) Bikeway City Funded Complete D Seventh Ward $10,500.00 22-Aug-13 A 15-Oct-13 A Install new pavement markings and  signage
DPW129 Miro St (Elysian Fields Ave - Orleans Ave) PTP Complete ACD Mid-City $978,426.00 04-Jan-10 A 16-Jun-11 A Rehabilitation of roadway by milling existing surface and  overlay with new asphalt, including pre-milling patching repairs as well as  adjustment of utility manholes, where applicable, installation of ADA  ramps.
DPW519 Monticello/Cecil (Airline Hwy. - Palm St.) City Funded Complete A Hollygrove $92,414.30 01-Jun-15 A 15-Jun-15 A Asphalt Patching and Mill Overlay
DPW345 Morrison Rd. (Lamb - Mayo) PTP Complete E Little Woods $961,917.00 16-Jul-12 A 01-Nov-12 A Remove and  replace existing roadway, install new American  with Disabilities Act-compliant curb ramps. Visit www.pavinglaroads.com for additional  detail.
DPW574 Morrison Rd. (Mayo - Read) Federal Planning E Little Woods $5,871,495.89 Jan-Feb-Mar 2018 Jul-Aug-Sep 2018 Remove and replace  existing roadway, install new American with  Disabilities Act-compliant curb ramps
DPW575 Morrison Rd. (Read - Bullard) Federal Planning E Little Woods $3,892,939.82 Jan-Feb-Mar 2018 Jul-Aug-Sep 2018 Remove and replace  existing roadway, install new American with  Disabilities Act-compliant curb ramps
DPW540 Murl and Wall Intersection Restoration City Funded Complete C Behrman $115,124.13 22-Jun-15 A 02-Jul-15 A Concrete panel replacement.
DPW373 N Peters St. (Canal - St Louis) PTP Complete C French Quarter $1,200,219.00 23-Jul-12 A 31-Dec-12 A Remove and  replace existing roadway, install new American  with Disabilities Act-compliant curb ramps. Visit www.pavinglaroads.com for additional  detail.
DPW526 N. Dupre St. (Bell St. - Desoto St.) City Funded Complete A Bayou St. John $33,584.10 20-Jul-15 A 29-Jul-15 A Asphalt  Patching and Mill Overlay
DPW527 N. Dupre St. (Esplanade - Lepage St.) City Funded Complete A Fairgrounds $16,410.90 20-Jul-15 A 29-Jul-15 A Asphalt  Patching and Mill Overlay
DPW067 N. Galvez St. (Elysian Fields Ave  - Almonaster Ave ) CDBG Funded Construction CD St. Roch $6,751,425.00 13-Jul-15 A Oct-Nov-Dec 2016 Reconstruction of existing roadway,  including the replacement of affected utilities.
DPW289 N. Galvez St. (Orleans Ave. - Poydras) PTP Complete AB Mid-City $3,309,167.00 04-Jan-10 A 16-Jun-11 A Rehabilitation of roadway by milling existing surface and  overlay with new asphalt, including pre-milling patching repairs as well as  adjustment of utility manholes, where applicable  installation of ADA  ramps.
DPW130 N. Galvez St. (Tennessee St  - Delery St) City Funded Complete E Lower Ninth Ward $10,806,000.00 06-Jul-15 A 21-Sep-16 A Reconstruction of existing roadway,  including the replacement of affected utilities.
DPW435 N. Robertson (Esplanade Ave. - St Bernard Ave) CDBG Funded Complete D Seventh Ward $191,070.00 21-Jul-14 A 27-Aug-14 A Rehabilitation of asphalt pavement including mill, patching, and 2-inch  overlay. Additional improvements include sidewalk repair, construction of ADA  ramps, installation of high-visibility crosswalks, and other roadway  striping.
DPW522 N. Roman (St. Louis - Conti) City Funded Complete B Tulane - Gravier $116,996.00 20-Jul-15 A 04-Sep-15 A Asphalt  Patching and Mill Overlay
DPW565 N. Tonti St (Bayou Rd - Columbus) Columbus St (N. Tonti - Rocheblave St.) City Funded Complete D Fairgrounds $88,000.00 13-Jun-16 A 12-Sep-16 A Installing four new catch basins at the intersection of  N. Tonti and Columbus, installing a new perforated drainage pipe, removing and  replacing driveway aprons with pervious concrete, installing new concrete  sidewalks, re-establishing drainage ditches, and placing gravel cover over  drainage ditches to retain available curbside parking.
DPW433 N. Villiere St. (Esplanade Ave. - Annette) CDBG Funded Complete D Seventh Ward $196,418.75 28-Jul-14 A 27-Aug-14 A Rehabilitation of asphalt pavement including mill, patching, and 2-inch  overlay. Additional improvements include sidewalk repair, construction of ADA  ramps, installation of high-visibility crosswalks, and other roadway  striping.
DPW238 Napoleon, Broad and Fontainebleau Intersection Design CDBG Funded Complete B Broadmoor $61,685.00   07-Aug-12 A May include sidewalk or other  pedestrian walkway improvements, bikeways, traffic and pedestrian signage or  signalization, landscaping, lighting, or public art.
DPW290 Napoleon-Freret Roadway Improvements (Clara St. (Napoleon - Cadiz), Jena (Clara - S. Claiborne)) CDBG Funded Complete B Freret $629,473.18 11-Feb-11 A 14-Oct-11 A Improvements to various minor streets,  which may include reconstruction and/or milling and overlay.
DPW284 Nashville Ave (Caliborne US 90 - Tchoupitoulas) Bikeway City Funded Complete A Audubon $22,955.60 22-Aug-13 A 04-Nov-13 A Install new pavement markings and  signage
DPW131 Nashville Ave (Claiborne US 90 - Magazine St ) (Magazine St - Tchoupitoulas St) PTP Complete A Uptown $5,429,536.00 09-Nov-09 A 16-Dec-10 A Rehabilitation of roadway by milling existing surface and  overlay with new asphalt, including pre-milling patching repairs as well as  adjustment of utility manholes where applicable, removal & replacement of  sidewalks &  installation of ADA ramps.
DPW358 Nashville Ave. (S. Claiborne - Fountainbleau) PTP Complete A Marlyville & Fontainbleau $622,132.00 23-Aug-13 A 06-Nov-13 A Remove and  replace existing roadway, install new American  with Disabilities Act-compliant curb ramps. Visit www.pavinglaroads.com for additional  detail.
DPW279 Navarre Ave ( Canal Blvd - Marconi Dr) Bikeway City Funded Complete A City Park $5,000.00 22-Aug-13 A 21-Oct-13 A Install new pavement markings and  signage
DPW132 Navarre Ave. (Canal Blvd. - Marconi Dr) PTP Complete A Lakeview $808,592.00 04-Jan-10 A 16-Nov-10 A Rehabilitation of roadway by milling existing surface and  overlay with new asphalt, including pre-milling patching repairs as well as  adjustment of utility manholes, where applicable, installation of ADA  ramps.
DPW239 New Orleans East Streetscape Improvements (Read Blvd, Lakeforest Blvd, Crowder Rd) CDBG Funded Complete E New Orleans East $2,882,842.38 19-Apr-12 A 14-Jun-13 A An enhancement project that may  include: New sidewalks along Lake Forest Blvd, with access to the New Orleans  East Regional Library and Joe Brown Park, new seating and trach receptacles at a  small park at the corner of Lake Forest and Wright Rd, installing a new walking  path on Lake Forest Blvd from Wright Rd to Read Blvd, Adding about 140  additional lights and more that 30 new trees,  and developing a dedicated bike lane on Read Blvd,  Crowder Blvd and Lake Forest Blvd.
DPW137 New Orleans Museum District Enhancement Federal Complete B Central Business District $543,834.58 07-Jan-14 A 21-Aug-14 A An enhancement project that may  include: Removal and replacement of concrete curbs, walkways, gutters, and  driveways, installation of new brick sidewalks, removal and replacement of  asphalt pavement, adjustment of manholes, catch basins and in-ground utility bases, installation of new ADA-compliant  ramps at corners, planting new plants. trees and tree  grates.
DPW390 Newton St (Whitney - Behrman) PTP Complete C Whitney $1,059,700.00 18-Aug-14 A 05-Dec-14 A Remove and  replace existing roadway, install new American  with Disabilities Act-compliant curb ramps. Visit www.pavinglaroads.com for additional  detail.
DPW387 Newton St (Whitney - Teche) PTP Complete C Whitney $913,200.00 08-Apr-14 A 27-Jun-14 A Remove and  replace existing roadway, install new American  with Disabilities Act-compliant curb ramps. Visit www.pavinglaroads.com for additional  detail.
DPW402 North Galvez (Orleans - Elysian Fields Ave) PTP Complete D Seventh Ward $2,777,300.00 16-Jun-14 A 29-Sep-14 A Remove and  replace existing roadway, install new American  with Disabilities Act-compliant curb ramps. Visit www.pavinglaroads.com for additional  detail.
DPW093 Octavia (Freret - Claiborne) City Funded Design A Audubon $3,950,000.00 Jan-Feb-Mar 2019 Oct-Nov-Dec 2019 Reconstruction of existing roadway,  including the replacement of affected utilities.
DPW504 Old Behrman Hwy (Marr - Behrman Hwy) PTP Complete C Behrman $3,507,440.00 04-Jan-16 A 03-Jun-16 A Cold plane  existing asphalt pavement to remain on-site, milled material to be spread and  graded through-out roadway width, superpave asphalt surfacing of 5” minimum for  entire project, re-grade shoulders and roadside ditches as required, and  permanent striping. Visit www.pavinglaroads.com     for additional detail.
DPW514 Old Gentilly Rd. (Louisa - Desire) City Funded Complete D Desire Area $19,038.10 03-Nov-14 A 31-Dec-14 A Concrete panel replacement and  installation of ADA ramps.
DPW568 Old Gentilly Road (Chef Menteur - Read) City Funded Complete E Viavant $522,000.00 18-Apr-16 A 23-Sep-16 A Redefining ditches, drainage upgrades and  repairs.
DPW534 Old Hammond Hwy (Parish Line - Regent St.) City Funded Complete A West End $400,000.00 24-Aug-15 A 25-Sep-15 A Full depth reconstruction of the roadway.
DPW144 Old Spanish Trail (Nighthart St - Sherwood Dr) City Funded Bid & Award E Read Blvd East $2,927,616.00 Jul-Aug-Sep 2018 Oct-Nov-Dec 2018 Reconstruction of existing roadway, including the replacement of affected  utilities.
DPW415 Oleander St. (Short - Burdette) CDBG Funded Complete A Gert Town $96,955.00 08-Aug-14 A 13-Sep-14 A Rehabilitation of asphalt pavement including mill, patching, and 2-inch  overlay. Additional improvements include sidewalk repair, construction of ADA  ramps, installation of high-visibility crosswalks, and other roadway  striping.
DPW322 Opelousas Street Extension (Behrman Avenue to O'Bannon St.) City Funded Complete C Algiers Point $1,492,686.37 11-Feb-11 A 27-Jun-11 A Rehabilitation of roadway by milling existing surface and  overlay with new asphalt, including pre-milling patching repairs as well as  adjustment of utility manholes, where applicable.
DPW140 Oretha Castle Haley Blvd Streetscape (St. Andrew St. - Calliope St.) CDBG Funded Construction B Central City $965,000.00 22-Aug-16 A Jan-Feb-Mar 2017 An enhancement project that may  include: Removal of the median between Felicity St and Martin Luther King Blvd,  larger pedestrian crossings/medians at intersections, installation of new  ADA-compliant ramp curbs, repairs to damaged sidewalks, conversion of the  roadway from two travel lanes  and parking lane into a parking lane, bicycle lane  and travel lane in each direction.
DPW145 Orleans Ave. (N. Claiborne Ave - City Park Ave.) PTP Complete A Mid-City $4,437,504.00 04-Jan-10 A 01-Oct-11 A Rehabilitation of roadway by milling existing surface and  overlay with new asphalt, including pre-milling patching repairs as well as  adjustment of utility manholes, where applicable, installation of ADA  ramps.
DPW414 Orpheus Ct. (S. Carrollton Ave. - Short) CDBG Funded Complete A Gert Town $18,570.00 11-Aug-14 A 15-Sep-14 A Rehabilitation of asphalt pavement including mill, patching, and 2-inch  overlay. Additional improvements include sidewalk repair, construction of ADA  ramps, installation of high-visibility crosswalks, and other roadway  striping.
DPW388 Pace Blvd (Gen Meyer Ave - Wall Blvd) PTP Complete C Behrman $1,305,000.00 08-Apr-14 A 27-Jun-14 A Remove and  replace existing roadway, install new American  with Disabilities Act-compliant curb ramps. Visit www.pavinglaroads.com for additional  detail.
DPW147 Paris Ave. (I-610 - Mirabeau Ave) PTP Complete D St. Bernard Area $742,125.00 20-Nov-09 A 16-Apr-12 A Rehabilitation of roadway by milling existing surface and  overlay with new asphalt, including pre-milling patching repairs as well as  adjustment of utility manholes, where applicable, Concrete panel replacement,  removal & replacement of sidewalks, installation of ADA ramps, bike lane  striping & signage.
DPW150 Park Island Bridge over Bayou St. John City Funded Complete AD Filmore $57,267.37 08-Dec-09 A 01-Jun-11 A Bridge  reconstruction
PWF006 Patching Repairs - City Park FEMA Phase I Complete A City Park $250,687.19 17-May-10 A 22-Nov-10 A Patching repairs of streets and  sidewalks damaged by storm waters and debris removal.
PWF013 Patching Repairs - Filmore FEMA Phase I Complete D Filmore $1,933,364.98 15-Feb-10 A 03-Aug-10 A Patching repairs of streets and  sidewalks damaged by storm waters and debris removal.
PWF018 Patching Repairs - Gentilly Woods FEMA Phase I Complete D Gentilly Woods $439,126.74 06-Jul-10 A 10-Sep-10 A Patching repairs of streets and  sidewalks damaged by storm waters and debris removal.
PWF023 Patching Repairs - Lake Terrace & Oaks FEMA Phase I Complete D Lake Terrace and Oaks $713,575.64 30-Aug-10 A 15-Dec-10 A Patching repairs of streets and  sidewalks damaged by storm waters and debris removal.
PWF024 Patching Repairs - Lakeshore - Lake Vista FEMA Phase I Complete D Lakeshore-LakeVista $820,539.58 15-Mar-10 A 27-Aug-10 A Patching repairs of streets and  sidewalks damaged by storm waters and debris removal.
PWF025 Patching Repairs - Lakeview FEMA Phase I Complete A Lakeview $6,519,419.88 14-Apr-09 A 22-Jul-10 A Patching repairs of streets and sidewalks damaged by storm waters and debris  removal.
PWF026 Patching Repairs - Lakewood FEMA Phase I Complete A Lakewood $290,934.76 17-Aug-09 A 03-Jun-10 A Patching repairs of streets and  sidewalks damaged by storm waters and debris removal.
PWF030 Patching Repairs - Lower Ninth Ward FEMA Phase I Complete E Lower Ninth Ward $2,809,878.02 23-Mar-09 A 04-Feb-11 A Patching repairs of streets and  sidewalks damaged by storm waters and debris removal.
PWF032 Patching Repairs - Marlyville & Fontainebleau FEMA Phase I Complete AB Marlyville & Fontainbleau $1,303,448.32 14-Jun-10 A 10-Dec-10 A Patching repairs of streets and  sidewalks damaged by storm waters and debris removal.
PWF034 Patching Repairs - Milan & Touro Neighborhoods FEMA Phase I Complete B Milan & Touro Neighborhoods $634,181.33 05-Apr-10 A 15-Jul-10 A Patching repairs of streets and  sidewalks damaged by storm waters and debris removal.
PWF035 Patching Repairs - Milneburg FEMA Phase I Complete D Milneburg $3,154,102.75 02-Oct-09 A 23-Jul-10 A Patching repairs of streets and  sidewalks damaged by storm waters and debris removal.
PWF036 Patching Repairs - Navarre FEMA Phase I Complete A Navarre $731,765.13 23-Aug-10 A 07-Jan-11 A Patching repairs of streets and  sidewalks damaged by storm waters and debris removal.
PWF039 Patching Repairs - Pines Village FEMA Phase I Complete D Pines Village $901,206.41 26-Apr-10 A 20-Jul-10 A Patching repairs of streets and  sidewalks damaged by storm waters and debris removal.
PWF043 Patching Repairs - Read Blvd West FEMA Phase I Complete E Read Blvd West $2,235,635.64 03-Aug-09 A 12-May-10 A Patching repairs of streets and  sidewalks damaged by storm waters and debris removal.
PWF049 Patching Repairs - Treme - Lafitte FEMA Phase I Complete CD Treme - Lafitte $2,318,252.27 01-Dec-09 A 17-May-10 A Patching repairs of streets and  sidewalks damaged by storm waters and debris removal.
PWF051 Patching Repairs - Uptown & West Riverside FEMA Phase I Complete AB Uptown & West Riverside $727,106.35 02-Nov-09 A 06-May-10 A Patching repairs of streets and  sidewalks damaged by storm waters and debris removal.
PWF053 Patching Repairs - West End FEMA Phase I Complete A West End $1,528,470.71 26-Oct-09 A 10-Dec-10 A Patching repairs of streets and  sidewalks damaged by storm waters and debris removal.
DPW323 Patterson Drive Extension Phase 1 (Hendee St. to Heerman St) City Funded Complete C Old Aurora $1,626,042.46 03-Dec-12 A 13-May-13 A Rehabilitation of roadway by milling existing surface and  overlay with new asphalt, including pre-milling patching repairs as well as  adjustment of utility manholes, where applicable.
DPW380 Patterson Drive Extension Phase 2 Heerman St to O'Bannon St.) City Funded Complete C Old Aurora $439,649.76 15-Sep-14 A 14-Nov-14 A Rehabilitation of roadway by milling existing surface and  overlay with new asphalt, including pre-milling patching repairs as well as  adjustment of utility manholes, where applicable.
DPW501 Pavement Condition Survey Analysis Phase I City Funded Complete ABCDE City Wide $555,725.00 08-Dec-14 A 31-Aug-16 A A comprehensive assessment of City-owned  streets. Results of the assessment will be used to calculate each roadway’s  “Pavement Condition Index” score. The City will use the score to help prioritize  future infrastructure improvements.
DPW503 Pavement Condition Survey Analysis Phase II City Funded Complete ABCDE City Wide $492,500.00 23-Feb-15 A 12-Feb-16 A A comprehensive assessment of City-owned  streets. Results of the assessment will be used to calculate each roadway’s  “Pavement Condition Index” score. The City will use the score to help prioritize  future infrastructure improvements.
DPW564 Pontilly Drainage Repairs Federal Design D Pontchartrain Park and Gentilly Woods $13,500,000.00 Jan-Feb-Mar 2017 Jan-Feb-Mar 2018 Combines improvements to the Dwyer  Canal with a network of interventions along streets, in alleyways, and within  vacant lots designed to store and slow stormwater
DPW510 Poydras and S. Claiborne City Funded Complete B Central Business District $127,687.30 03-Nov-14 A 31-Dec-14 A Concrete panel replacement and  installation of ADA ramps.
DPW158 Poydras St (Carondelet St - Camp St) PTP Complete B Central Business District $129,243.00 03-Nov-09 A 25-Aug-10 A Rehabilitation of roadway by milling existing surface and  overlay with new asphalt, including pre-milling patching repairs as well as  adjustment of utility manholes, where applicable, lakebound, Camp- St Charles  only.
DPW159 Poydras St (LaSalle St  - Loyola Ave) PTP Complete B Central Business District $106,042.00 03-Nov-09 A 25-Aug-10 A Installation of compliant ADA ramps, Bike lane striping  & signage.
DPW255 Press Dr( US 90 - Robert E Lee Blvd ) Bikeway City Funded Complete D Gentilly Woods $20,400.00 08-Dec-09 A 16-Jun-10 A Install new pavement markings and  signage
DPW233 Press Drive Streetscape  (Chef - Leon C Simon) CDBG Funded Complete D Pontchartrain Park $231,163.69 19-Apr-12 A 17-Dec-13 A An enhancement project that may include: Planting more  than 250 trees and over 533 shrubs on the median from Chef Menteur Hwy to Leon  C. Simon Blvd, installing neighborhood signage at Press Dr, as well as signs  denoting the Gentilly Woods and Pontchartrain Park Neighborhoods.
PWF129 Recovery Program - Holy Cross - Part 1 FEMA Phase II Complete E Holy Cross $3,901,740.97 20-Oct-14 A 03-Dec-15 A Repair  Hurricane Katrina related infrastructure damage. May include total or partial  replacement of utilities,  sidewalks, American with Disabilities Act-compliant curb ramps, driveway aprons,  curbs and road paving. Visit RecoveryRoads.nola.gov for additional  detail.
PWF170 Recovery Program - Holy Cross - Part 2 FEMA Phase II Complete E Holy Cross $567,491.55 12-Jan-15 A 30-Jul-15 A Repair  Hurricane Katrina related infrastructure damage. May include total or partial  replacement of utilities,  sidewalks, American with Disabilities Act-compliant curb ramps, driveway aprons,  curbs and road paving. Visit RecoveryRoads.nola.gov for additional  detail.
PWF102 Recovery Program - Lakeview - Vicksburg St. Demonstration FEMA Phase II Complete A Lakeview $250,000.00 01-Oct-12 A 03-Dec-12 A Repair  Hurricane Katrina related infrastructure damage. May include total or partial  replacement of utilities,  sidewalks, American with Disabilities Act-compliant curb ramps, driveway aprons,  curbs and road paving. Visit RecoveryRoads.nola.gov for additional  detail.
PWF172 Recovery Program - Lakeview (Pavement  Only Quad 1) FEMA Phase II Construction A Lakeview $3,012,377.49 26-Jan-15 A Oct-Nov-Dec 2016 Repair  Hurricane Katrina related infrastructure damage. May include total or partial  replacement of sidewalks,  American with Disabilities Act-compliant curb ramps, driveway aprons, curbs and  road paving. Visit RecoveryRoads.nola.gov for additional  detail.
PWF156 Recovery Program - Lower Ninth Ward (Lizardi St) FEMA Phase II Complete E Lower Ninth Ward $727,058.94 08-Apr-13 A 17-Jun-13 A Repair  Hurricane Katrina related infrastructure damage. May include total or partial  replacement of utilities,  sidewalks, American with Disabilities Act-compliant curb ramps, driveway aprons,  curbs and road paving. Visit RecoveryRoads.nola.gov for additional  detail.
PWF096 Recovery Program - Lower Ninth Ward (Pavement Only - Quad 1) FEMA Phase II Complete E Lower Ninth Ward $1,723,544.43 07-Mar-16 A 12-Sep-16 A Repair  Hurricane Katrina related infrastructure damage. May include total or partial  replacement of sidewalks,  American with Disabilities Act-compliant curb ramps, driveway aprons, curbs and  road paving. Visit RecoveryRoads.nola.gov for additional  detail.
PWF157 Recovery Program - Lower Ninth Ward (Pavement Only - Quad 2) FEMA Phase II Complete E Lower Ninth Ward $9,222,690.34 06-Apr-15 A 28-Jan-16 A Repair  Hurricane Katrina related infrastructure damage. May include total or partial  replacement of sidewalks,  American with Disabilities Act-compliant curb ramps, driveway aprons, curbs and  road paving. Visit RecoveryRoads.nola.gov for additional  detail.
PWF171 Recovery Program - Lower Ninth Ward (Pavement Only - Quad 3) FEMA Phase II Complete E Lower Ninth Ward $4,572,981.93 05-Oct-15 A 02-Sep-16 A Repair  Hurricane Katrina related infrastructure damage. May include total or partial  replacement of sidewalks,  American with Disabilities Act-compliant curb ramps, driveway aprons, curbs and  road paving. Visit RecoveryRoads.nola.gov for additional  detail.
PWF080 Recovery Program - Lower Ninth Ward Phase II (Deslonde and Flood) FEMA Phase II Complete E Lower Ninth Ward $4,905,081.90 25-Mar-13 A 25-Mar-14 A Repair  Hurricane Katrina related infrastructure damage. May include total or partial  replacement of utilities,  sidewalks, American with Disabilities Act-compliant curb ramps, driveway aprons,  curbs and road paving. Visit RecoveryRoads.nola.gov for additional  detail.
PWF099 Recovery Program - St. Claude (Pavement  Only) FEMA Phase II Construction CD St. Claude $8,606,395.31 15-Sep-15 A Oct-Nov-Dec 2016 Repair  Hurricane Katrina related infrastructure damage. May include total or partial  replacement of sidewalks,  American with Disabilities Act-compliant curb ramps, driveway aprons, curbs and  road paving. Visit RecoveryRoads.nola.gov for additional  detail.
PWF082 Recovery Program - St. Claude Phase II Group 1 FEMA Phase II Complete CD St. Claude $3,555,135.32 24-Feb-14 A 21-Apr-15 A Repair  Hurricane Katrina related infrastructure damage. May include total or partial  replacement of utilities,  sidewalks, American with Disabilities Act-compliant curb ramps, driveway aprons,  curbs and road paving. Visit RecoveryRoads.nola.gov for additional  detail.
PWF158 Recovery Program - St. Claude Quadrant 1- Feliciana St FEMA Phase II Complete CD St. Claude $120,054.06 04-Mar-13 A 23-May-13 A Repair  Hurricane Katrina related infrastructure damage. May include total or partial  replacement of utilities,  sidewalks, American with Disabilities Act-compliant curb ramps, driveway aprons,  curbs and road paving. Visit RecoveryRoads.nola.gov for additional  detail.
PWF132 Recovery Program - SWB - French Quarter/CBD Contract 2105 FEMA Phase II Construction C French Quarter $8,265,445.61 18-Nov-13 A Jan-Feb-Mar 2017 Repair  Hurricane Katrina related infrastructure damage. May include total or partial  replacement of utilities,  sidewalks, American with Disabilities Act-compliant curb ramps, driveway aprons,  curbs and road paving. Visit RecoveryRoads.nola.gov for additional  detail.
PWF118 Recovery Program - Touro FEMA Phase II Complete B Touro $741,804.08 08-Dec-14 A 06-Aug-15 A Repair  Hurricane Katrina related infrastructure damage. May include total or partial  replacement of utilities,  sidewalks, American with Disabilities Act-compliant curb ramps, driveway aprons,  curbs and road paving. Visit RecoveryRoads.nola.gov for additional  detail.
PWF155 Recovery Program - Venetian Isles FEMA Phase II Complete E Venetian Isles $712,179.42 07-Jul-14 A 24-Mar-15 A Repair  Hurricane Katrina related infrastructure damage. May include total or partial  replacement of utilities,  sidewalks, American with Disabilities Act-compliant curb ramps, driveway aprons,  curbs and road paving. Visit RecoveryRoads.nola.gov for additional  detail.
DPW320 Reinventing the Crescent Infrastructure Imp. N Peters(St Philip-St Ferdinand)Chartres(Piety-Gallier) City Funded Complete C Marigny & Bywater Neighborhoods $816,507.91 19-Oct-09 A 03-Jun-10 A Rehabilitation of roadway by milling existing surface and  overlay with new asphalt, including pre-milling patching repairs as well as  adjustment of utility manholes, where applicable, installation of Sidewalks  & ADA ramps.
DPW437 Reynes St. (St. Claude Ave. - Douglas) CDBG Funded Complete E Holy Cross $146,037.38 12-Aug-14 A 19-Sep-14 A Rehabilitation of asphalt pavement including mill, patching, and 2-inch  overlay. Additional improvements include sidewalk repair, construction of ADA  ramps, installation of high-visibility crosswalks, and other roadway  striping.
DPW254 Robert E Lee Blvd ( St. Bernard Ave- Paris Ave) Bikeway City Funded Complete AD Filmore $13,300.00 13-Jan-14 A 17-Jan-14 A Install new pavement markings and  signage
DPW353 Robert E Lee Blvd. (Elysian Fields - Franklin) PTP Complete D Milneburg $1,036,904.00 17-Jun-13 A 19-Sep-13 A Remove and  replace existing roadway, install new American  with Disabilities Act-compliant curb ramps. Visit www.pavinglaroads.com for additional  detail.
DPW317 Robert E. Lee (Paris to Pratt) Federal Complete A Filmore $3,139,588.93 02-Nov-09 A 05-May-10 A Reconstruction of existing roadway, including the replacement of  affected utilities.
DPW241 Robert E. Lee Blvd (Perlita Dr - Chatham Dr) and Paris Ave. (Robert E. Lee - Aviators) Streetscape CDBG Funded Complete D Filmore $619,998.41 12-Aug-13 A 17-Apr-14 A An enhancement project that may include: Installation of new sidewalks and  driveway aprons, installation of ADA-complaint ramps at sidewalk corners, new  bicycle lane striping, fresh crosswalk and pavement striping, new landscaping  including planting of about 75 trees, new neighborhood signage and lighting, and  improved drainage.
DPW173 Robert E. Lee over London Avenue Canal City Funded Planning AD City Park $1,600,000.00 TBD TBD Bridge reconstruction
DPW556 Rousseau St. (Josephine - Jackson) CDBG Funded Complete B St. Thomas Dev $80,000.00 13-Jun-16 A 12-Jul-16 A This project will accomplish the rehabilitation of  asphalt pavement including, milling, full depth patching and 2-inch overlay,  clearing and sealing of joints and curb repair. Additional improvements may  include features to improve access for all users such as sidewalk repair, construction of ADA ramps,  installation of high-visibility crosswalks and other roadway striping, and  installation of new way finding and other street  signage.
DPW374 Royal St. (Canal - Esplanade) PTP Complete C French Quarter $1,583,942.00 23-Jul-12 A 31-Dec-12 A Remove and  replace existing roadway, install new American  with Disabilities Act-compliant curb ramps. Visit www.pavinglaroads.com for additional  detail.
RR001 RR3 - Audubon Group A (PMOPI) CIP Planning A Audubon $10,710,889.87 Jan-Feb-Mar 2017 Apr-May-Jun 2018 Scope of work may include repaving the asphalt roadway from curb-to-curb, replacing damaged portions of concrete with new concrete, patching the roadway with asphalt, repairing damaged sidewalks and driveway aprons, installing ADA compliant curb ramps at intersections, and replacing/repairing damaged underground water, sewer and/or drainage lines.
RR002 RR3 - Audubon Group B (FRC) CIP Planning A Audubon $10,321,869.87 Oct-Nov-Dec 2018 Jan-Feb-Mar 2019 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR003 RR3 - Bayou St John, Fairgrounds, Seventh Ward  Group A (INC) CIP Planning AD Fairgrounds/Bayou St. John, Seventh Ward $10,371,988.53 Apr-May-Jun 2017 Oct-Nov-Dec 2017 Scope of work may include patching the roadway with asphalt, repairing damaged curbs and gutters, repairing damaged sidewalks and driveway aprons, installing ADA compliant curb ramps at intersections, and replacing/repairing damaged underground water, sewer and/or drainage lines.
RR004 RR3 - Bayou St John, Fairgrounds, Seventh Ward  Group B (PMOPC) CIP Planning AD Fairgrounds/Bayou St. John, Seventh Ward $22,698,774.15 Oct-Nov-Dec 2017 Jan-Feb-Mar 2019 Scope of work may include repaving the asphalt roadway from curb-to-curb, replacing damaged portions of concrete with new concrete, repairing damaged sidewalks and driveway aprons, installing ADA compliant curb ramps at intersections, and replacing/repairing damaged underground water, sewer and/or drainage lines.
RR005 RR3 - Bayou St John, Fairgrounds, Seventh Ward  Group C (FRC) CIP Planning AD Fairgrounds/Bayou St. John, Seventh Ward $5,552,095.01 Jan-Feb-Mar 2019 Apr-May-Jun 2020 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR006 RR3 - Bayou St John, Fairgrounds, Seventh Ward  Group D (FRC) CIP Planning AD Fairgrounds/Bayou St. John, Seventh Ward $5,446,793.61 Oct-Nov-Dec 2019 Oct-Nov-Dec 2020 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR007 RR3 - Bayou St John, Fairgrounds, Seventh Ward  Group E (FRC) CIP Planning AD Fairgrounds/Bayou St. John, Seventh Ward $5,202,214.60 Jul-Aug-Sep 2020 Jul-Aug-Sep 2021 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR008 RR3 - Black Pearl Group B (FRC) CIP Planning A Black Pearl $7,734,401.40 Jan-Feb-Mar 2018 Jan-Feb-Mar 2019 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR009 RR3 - Black Pearl, East Carrollton Group A (PMOPI) CIP Planning A East Carrollton/Black Pearl $13,081,265.68 Apr-May-Jun 2017 Apr-May-Jun 2018 Scope of work may include repaving the asphalt roadway from curb-to-curb, replacing damaged portions of concrete with new concrete, patching the roadway with asphalt, repairing damaged sidewalks and driveway aprons, installing ADA compliant curb ramps at intersections, and replacing/repairing damaged underground water, sewer and/or drainage lines.
RR010 RR3 - Broadmoor Group A (PMOPI) CIP Planning AB Broadmoor $17,706,857.15 Apr-May-Jun 2017 Apr-May-Jun 2018 Scope of work may include repaving the asphalt roadway from curb-to-curb, replacing damaged portions of concrete with new concrete, patching the roadway with asphalt, repairing damaged sidewalks and driveway aprons, installing ADA compliant curb ramps at intersections, and replacing/repairing damaged underground water, sewer and/or drainage lines.
RR011 RR3 - Broadmoor Group C (FRC) CIP Planning AB Broadmoor $5,994,732.43 Apr-May-Jun 2018 Apr-May-Jun 2019 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR012 RR3 - Broadmoor Group D (FRC) CIP Planning AB Broadmoor $7,413,279.98 Apr-May-Jun 2019 Apr-May-Jun 2020 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR013 RR3 - Broadmoor Group E (FRC) CIP Planning AB Broadmoor $4,861,828.35 Apr-May-Jun 2020 Apr-May-Jun 2021 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR014 RR3 - BW Cooper, Gert Town, Dixon  Group A (PMOI) CIP Planning AB Gert Town/B. W. Cooper, Dixon $8,577,379.76 Jul-Aug-Sep 2017 Jul-Aug-Sep 2018 Scope of work may include repaving the asphalt roadway from curb-to-curb, patching the roadway with asphalt, repairing damaged sidewalks and driveway aprons, installing ADA compliant curb ramps at intersections, and replacing/repairing damaged underground water, sewer and/or drainage lines.
RR015 RR3 - BW Cooper, Gert Town, Dixon  Group B (PMOI) CIP Planning AB Gert Town/B. W. Cooper, Dixon $19,184,035.38 Jan-Feb-Mar 2018 Jan-Feb-Mar 2019 Scope of work may include repaving the asphalt roadway from curb-to-curb, patching the roadway with asphalt, repairing damaged sidewalks and driveway aprons, installing ADA compliant curb ramps at intersections, and replacing/repairing damaged underground water, sewer and/or drainage lines.
RR016 RR3 - BW Cooper, Gert Town, Dixon  Group C (FRC) CIP Planning AB Gert Town/B. W. Cooper, Dixon $4,922,280.89 Oct-Nov-Dec 2018 Oct-Nov-Dec 2019 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR017 RR3 - BW Cooper, Gert Town, Dixon  Group D (FRC) CIP Planning AB Gert Town/B. W. Cooper, Dixon $6,389,386.39 Oct-Nov-Dec 2019 Oct-Nov-Dec 2020 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR018 RR3 - BW Cooper, Gert Town, Dixon  Group E (FRC) CIP Planning AB Gert Town/B. W. Cooper, Dixon $4,995,451.10 Jul-Aug-Sep 2020 Jul-Aug-Sep 2021 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR019 RR3 - BW Cooper, Gert Town, Dixon  Group F (FRC) CIP Planning AB Gert Town/B. W. Cooper, Dixon $3,405,309.85 Jul-Aug-Sep 2021 Jul-Aug-Sep 2022 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR020 RR3 - Bywater-Marigny Group A (FRCPI) CIP Planning C Marigny & Bywater Neighborhoods $3,969,611.98 Jul-Aug-Sep 2017 Jul-Aug-Sep 2018 Scope of work may include replacing damaged underground water, sewer and drainage lines, repaving the roadway, repaving the asphalt roadway from curb-to-curb, patching the roadway with asphalt, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR021 RR3 - Central City Group A (FRC) CIP Planning B Central City $7,165,751.18 Jan-Feb-Mar 2019 Jan-Feb-Mar 2020 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR022 RR3 - Central City Group B (PMOPI) CIP Planning B Central City $11,591,018.18 Jul-Aug-Sep 2019 Jul-Aug-Sep 2020 Scope of work may include repaving the asphalt roadway from curb-to-curb, replacing damaged portions of concrete with new concrete, patching the roadway with asphalt, repairing damaged sidewalks and driveway aprons, installing ADA compliant curb ramps at intersections, and replacing/repairing damaged underground water, sewer and/or drainage lines.
RR023 RR3 - Central City Group C (PMOPI) CIP Planning B Central City $13,738,926.27 Jan-Feb-Mar 2021 Jan-Feb-Mar 2022 Scope of work may include repaving the asphalt roadway from curb-to-curb, replacing damaged portions of concrete with new concrete, patching the roadway with asphalt, repairing damaged sidewalks and driveway aprons, installing ADA compliant curb ramps at intersections, and replacing/repairing damaged underground water, sewer and/or drainage lines.
RR024 RR3 - Central City Group D (FRC) CIP Planning B Central City $5,207,570.33 Oct-Nov-Dec 2021 Oct-Nov-Dec 2022 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR025 RR3 - City Park Group A (VAR) CIP Planning A City Park $6,873,637.92 Jul-Aug-Sep 2017 Jul-Aug-Sep 2018 Scope of work may include replacing damaged underground water, sewer and drainage lines, repaving the roadway, repaving the asphalt roadway from curb-to-curb, replacing damaged portions of concrete with new concrete, patching the roadway with asphalt, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR026 RR3 - Desire Group A (PMOPI) CIP Planning D Desire Area $3,214,592.71 Apr-May-Jun 2017 Jul-Aug-Sep 2017 Scope of work may include repaving the asphalt roadway from curb-to-curb, replacing damaged portions of concrete with new concrete, patching the roadway with asphalt, repairing damaged sidewalks and driveway aprons, installing ADA compliant curb ramps at intersections, and replacing/repairing damaged underground water, sewer and/or drainage lines.
RR027 RR3 - Desire Group B (PMOPC) CIP Planning D Desire Area $4,788,653.75 Oct-Nov-Dec 2018 Jan-Feb-Mar 2020 Scope of work may include repaving the asphalt roadway from curb-to-curb, replacing damaged portions of concrete with new concrete, repairing damaged sidewalks and driveway aprons, installing ADA compliant curb ramps at intersections, and replacing/repairing damaged underground water, sewer and/or drainage lines.
RR028 RR3 - Desire Group C (FRC) CIP Planning D Desire Area $6,360,767.64 Apr-May-Jun 2019 Apr-May-Jun 2020 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR029 RR3 - Desire Group D (FRCPC) CIP Planning D Desire Area $11,168,816.33 Oct-Nov-Dec 2020 Oct-Nov-Dec 2021 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR031 RR3 - Dillard Group A (PMOPI) CIP Planning D Dillard $10,985,583.39 Apr-May-Jun 2019 Apr-May-Jun 2020 Scope of work may include repaving the asphalt roadway from curb-to-curb, replacing damaged portions of concrete with new concrete, patching the roadway with asphalt, repairing damaged sidewalks and driveway aprons, installing ADA compliant curb ramps at intersections, and replacing/repairing damaged underground water, sewer and/or drainage lines.
RR032 RR3 - Dillard Group B (FRC) CIP Planning D Dillard $6,543,624.68 Jul-Aug-Sep 2020 Jul-Aug-Sep 2021 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR033 RR3 - East Carrollton Group B (FRC) CIP Planning A East Carrollton $5,412,268.19 Jul-Aug-Sep 2019 Jul-Aug-Sep 2020 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR034 RR3 - East Carrollton Group C (FRC) CIP Planning A East Carrollton $10,254,167.19 Oct-Nov-Dec 2021 Jan-Feb-Mar 2023 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR035 RR3 - East Riverside, Garden District, Irish Channel, St Thomas Group A (PMOI) CIP Planning B East Riverside, Garden District, Irish Channel, St Thomas Dev $8,913,622.55 Jul-Aug-Sep 2017 Jul-Aug-Sep 2018 Scope of work may include repaving the asphalt roadway from curb-to-curb, patching the roadway with asphalt, repairing damaged sidewalks and driveway aprons, installing ADA compliant curb ramps at intersections, and replacing/repairing damaged underground water, sewer and/or drainage lines.
RR036 RR3 - East Riverside, Garden District, Irish Channel, St Thomas Group B (FRC) CIP Planning B East Riverside, Garden District, Irish Channel, St Thomas Dev $1,696,529.91 Jul-Aug-Sep 2018 Jul-Aug-Sep 2019 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR037 RR3 - Filmore North Group A (PMOI) CIP Planning D Filmore $9,527,525.05 Jan-Feb-Mar 2017 Apr-May-Jun 2018 Scope of work may include repaving the asphalt roadway from curb-to-curb, patching the roadway with asphalt, repairing damaged sidewalks and driveway aprons, installing ADA compliant curb ramps at intersections, and replacing/repairing damaged underground water, sewer and/or drainage lines.
RR038 RR3 - Filmore North Group B (FRC) CIP Planning D Filmore $5,985,203.68 Jan-Feb-Mar 2018 Jan-Feb-Mar 2019 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR039 RR3 - Filmore North Group C (FRCP) CIP Planning D Filmore $5,817,647.87 Jan-Feb-Mar 2019 Jan-Feb-Mar 2020 Scope of work may include replacing damaged underground water, sewer and drainage lines, repaving the roadway, repaving the asphalt roadway from curb-to-curb, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR040 RR3 - Filmore North Group D (FRC) CIP Planning D Filmore $9,618,132.69 Jan-Feb-Mar 2020 Jan-Feb-Mar 2021 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR041 RR3 - Filmore North Group E (FRC) CIP Planning D Filmore $5,325,794.74 Jul-Aug-Sep 2019 Jul-Aug-Sep 2020 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR042 RR3 - Filmore South Group A (PMOPI) CIP Planning D Filmore $10,656,789.49 Apr-May-Jun 2017 Apr-May-Jun 2018 Scope of work may include repaving the asphalt roadway from curb-to-curb, replacing damaged portions of concrete with new concrete, patching the roadway with asphalt, repairing damaged sidewalks and driveway aprons, installing ADA compliant curb ramps at intersections, and replacing/repairing damaged underground water, sewer and/or drainage lines.
RR043 RR3 - Filmore South Group B (FRC) CIP Planning D Filmore $5,883,679.44 Jul-Aug-Sep 2018 Jul-Aug-Sep 2019 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR044 RR3 - Filmore South Group C (FRC) CIP Planning D Filmore $8,160,987.46 Apr-May-Jun 2020 Apr-May-Jun 2021 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR045 RR3 - Filmore South Group D (FRC) CIP Planning D Filmore $8,385,096.56 Jul-Aug-Sep 2021 Jul-Aug-Sep 2022 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR046 RR3 - Florida Area & Dev Group A (PMOI) CIP Planning D Florida Area $8,457,136.00 Jul-Aug-Sep 2018 Jul-Aug-Sep 2019 Scope of work may include repaving the asphalt roadway from curb-to-curb, patching the roadway with asphalt, repairing damaged sidewalks and driveway aprons, installing ADA compliant curb ramps at intersections, and replacing/repairing damaged underground water, sewer and/or drainage lines.
RR047 RR3 - Florida Area & Dev Group B (FRC) CIP Planning D Florida Area $2,674,497.98 Jul-Aug-Sep 2019 Jul-Aug-Sep 2020 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR048 RR3 - Florida Area & Dev Group C (FRC) CIP Planning D Florida Area $3,667,744.04 Jan-Feb-Mar 2021 Jan-Feb-Mar 2022 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR049 RR3 - Florida Area & Dev Group D (FRC) CIP Planning D Florida Area $4,004,132.83 Jan-Feb-Mar 2021 Jan-Feb-Mar 2022 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR050 RR3 - Freret Group A (PMOI) CIP Planning B Freret $4,889,255.29 Apr-May-Jun 2017 Jul-Aug-Sep 2017 Scope of work may include repaving the asphalt roadway from curb-to-curb, patching the roadway with asphalt, repairing damaged sidewalks and driveway aprons, installing ADA compliant curb ramps at intersections, and replacing/repairing damaged underground water, sewer and/or drainage lines.
RR051 RR3 - Gentilly Terrace Group A (INC) CIP Planning D Gentilly Terrace $6,284,892.95 Apr-May-Jun 2017 Oct-Nov-Dec 2017 Scope of work may include patching the roadway with asphalt, repairing damaged curbs and gutters, repairing damaged sidewalks and driveway aprons, installing ADA compliant curb ramps at intersections, and replacing/repairing damaged underground water, sewer and/or drainage lines.
RR052 RR3 - Gentilly Terrace Group B (PMO) CIP Planning D Gentilly Terrace $23,384,852.25 Apr-May-Jun 2019 Apr-May-Jun 2020 Scope of work may include repaving the asphalt roadway from curb-to-curb, repairing damaged sidewalks and driveway aprons, installing ADA compliant curb ramps at intersections, and replacing/repairing damaged underground water, sewer and/or drainage lines.
RR053 RR3 - Gentilly Terrace Group C (FRC) CIP Planning D Gentilly Terrace $3,880,567.69 Apr-May-Jun 2019 Apr-May-Jun 2020 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR054 RR3 - Gentilly Terrace Group D (FRC) CIP Planning D Gentilly Terrace $6,766,422.75 Jul-Aug-Sep 2019 Jul-Aug-Sep 2020 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR055 RR3 - Gentilly Terrace Group E (FRC) CIP Planning D Gentilly Terrace $6,112,553.24 Jan-Feb-Mar 2020 Jan-Feb-Mar 2021 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR056 RR3 - Gentilly Terrace Group F (FRC) CIP Planning D Gentilly Terrace $6,209,947.95 Jul-Aug-Sep 2020 Oct-Nov-Dec 2021 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR057 RR3 - Gentilly Terrace Group G (FRC) CIP Planning D Gentilly Terrace $5,244,051.58 Apr-May-Jun 2021 Apr-May-Jun 2022 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR058 RR3 - Gentilly Terrace Group H (FRC) CIP Planning D Gentilly Terrace $6,028,134.27 Jul-Aug-Sep 2019 Jul-Aug-Sep 2020 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR059 RR3 - Gentilly Terrace Group I (FRC) CIP Planning D Gentilly Terrace $4,293,975.39 Jan-Feb-Mar 2022 Jan-Feb-Mar 2023 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR060 RR3 - Gentilly Terrace Group J (FRC) CIP Planning D Gentilly Terrace $6,263,070.93 Jul-Aug-Sep 2022 Jul-Aug-Sep 2023 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR061 RR3 - Gentilly Woods Group F (FRCPI) CIP Planning D Gentilly Woods $12,470,109.29 Oct-Nov-Dec 2019 Oct-Nov-Dec 2020 Scope of work may include replacing damaged underground water, sewer and drainage lines, repaving the roadway, repaving the asphalt roadway from curb-to-curb, patching the roadway with asphalt, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR062 RR3 - Hollygrove Group B (PMOPC) CIP Planning A Hollygrove $11,752,854.49 Apr-May-Jun 2018 Apr-May-Jun 2019 Scope of work may include repaving the asphalt roadway from curb-to-curb, replacing damaged portions of concrete with new concrete, repairing damaged sidewalks and driveway aprons, installing ADA compliant curb ramps at intersections, and replacing/repairing damaged underground water, sewer and/or drainage lines.
RR063 RR3 - Hollygrove Group C (FRCPP) CIP Planning A Hollygrove $8,179,829.92 Oct-Nov-Dec 2019 Oct-Nov-Dec 2020 Scope of work may include replacing damaged underground water, sewer and drainage lines, repaving the roadway, repaving the asphalt roadway from curb-to-curb, replacing damaged portions of concrete with new concrete, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR064 RR3 - Hollygrove Group D (FRC) CIP Planning A Hollygrove $6,078,748.92 Jul-Aug-Sep 2020 Jul-Aug-Sep 2021 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR065 RR3 - Hollygrove Group E (FRC) CIP Planning A Hollygrove $6,100,376.52 Apr-May-Jun 2021 Jul-Aug-Sep 2022 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR066 RR3 - Hollygrove Group F (FRCPP) CIP Planning A Hollygrove $7,417,694.51 Jul-Aug-Sep 2022 Jul-Aug-Sep 2023 Scope of work may include replacing damaged underground water, sewer and drainage lines, repaving the roadway, repaving the asphalt roadway from curb-to-curb, replacing damaged portions of concrete with new concrete, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR067 RR3 - Hollygrove, Leonidas Group A (INC) CIP Planning A Hollygrove and Leonidas $8,712,640.95 Jan-Feb-Mar 2017 Jul-Aug-Sep 2017 Scope of work may include patching the roadway with asphalt, repairing damaged curbs and gutters, repairing damaged sidewalks and driveway aprons, installing ADA compliant curb ramps at intersections, and replacing/repairing damaged underground water, sewer and/or drainage lines.
RR068 RR3 - Iberville, Tulane-Gravier, LGD, CBD Group A (PMOPI) CIP Planning BC Tulane/Gravier/Iberville, LGD, and CBD $12,475,291.95 Oct-Nov-Dec 2018 Oct-Nov-Dec 2019 Scope of work may include repaving the asphalt roadway from curb-to-curb, replacing damaged portions of concrete with new concrete, patching the roadway with asphalt, repairing damaged sidewalks and driveway aprons, installing ADA compliant curb ramps at intersections, and replacing/repairing damaged underground water, sewer and/or drainage lines.
RR069 RR3 - Lake Terrace & Oaks Group A (PCI) CIP Planning D Lake Terrace and Oaks $4,986,254.40 Jan-Feb-Mar 2017 Apr-May-Jun 2018 Scope of work may include replacing damaged portions of concrete with new concrete, patching the roadway with asphalt, repairing damaged sidewalks and driveway aprons, installing ADA compliant curb ramps at intersections, and replacing/repairing damaged underground water, sewer and/or drainage lines.
RR070 RR3 - Lake Terrace & Oaks Group B (FRC) CIP Planning D Lake Terrace and Oaks $8,387,958.29 Jan-Feb-Mar 2020 Jan-Feb-Mar 2021 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR071 RR3 - Lake Terrace & Oaks Group C (FRC) CIP Planning D Lake Terrace and Oaks $10,323,382.07 Jul-Aug-Sep 2019 Jul-Aug-Sep 2020 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR072 RR3 - Lake Terrace & Oaks Group D (FRC) CIP Planning D Lake Terrace and Oaks $6,112,308.78 Jan-Feb-Mar 2018 Jan-Feb-Mar 2019 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR073 RR3 - Lake Vista Group A (PMOPI) CIP Planning D Lakeshore-LakeVista $3,364,778.86 Jul-Aug-Sep 2017 Jul-Aug-Sep 2018 Scope of work may include repaving the asphalt roadway from curb-to-curb, replacing damaged portions of concrete with new concrete, patching the roadway with asphalt, repairing damaged sidewalks and driveway aprons, installing ADA compliant curb ramps at intersections, and replacing/repairing damaged underground water, sewer and/or drainage lines.
RR074 RR3 - Lake Vista Group B (PMOPC) CIP Planning D Lakeshore-LakeVista $8,904,708.31 Jan-Feb-Mar 2019 Apr-May-Jun 2020 Scope of work may include repaving the asphalt roadway from curb-to-curb, replacing damaged portions of concrete with new concrete, repairing damaged sidewalks and driveway aprons, installing ADA compliant curb ramps at intersections, and replacing/repairing damaged underground water, sewer and/or drainage lines.
RR075 RR3 - Lake Vista Group C (FRC) CIP Planning D Lakeshore-LakeVista $6,901,350.40 Jul-Aug-Sep 2020 Jul-Aug-Sep 2021 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR076 RR3 - Lake Vista Group D (FRC) CIP Planning D Lakeshore-LakeVista $8,666,286.30 Jan-Feb-Mar 2021 Jan-Feb-Mar 2022 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR077 RR3 - Lake Vista Group E (FRC) CIP Planning D Lakeshore-LakeVista $11,398,882.31 Jul-Aug-Sep 2021 Jul-Aug-Sep 2022 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR078 RR3 - Lakeshore Group A (INC) CIP Planning D Lakeshore-LakeVista $4,082,465.97 Jan-Feb-Mar 2017 Jan-Feb-Mar 2018 Scope of work may include patching the roadway with asphalt, repairing damaged curbs and gutters, repairing damaged sidewalks and driveway aprons, installing ADA compliant curb ramps at intersections, and replacing/repairing damaged underground water, sewer and/or drainage lines.
RR079 RR3 - Lakeshore Group B (FRC) CIP Planning D Lakeshore-LakeVista $7,080,831.43 Oct-Nov-Dec 2018 Oct-Nov-Dec 2019 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR080 RR3 - Lakeshore Group C (FRC) CIP Planning D Lakeshore-LakeVista $8,197,060.24 Jan-Feb-Mar 2019 Jan-Feb-Mar 2020 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR081 RR3 - Lakeshore Group D (FRC) CIP Planning D Lakeshore-LakeVista $8,789,847.73 Jan-Feb-Mar 2021 Jan-Feb-Mar 2022 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR082 RR3 - Lakeshore Group E (FRC) CIP Planning D Lakeshore-LakeVista $1,984,533.49 Oct-Nov-Dec 2021 Oct-Nov-Dec 2022 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR083 RR3 - Lakeview North Group A (INC) CIP Design A Lakeview $6,023,444.05 Jan-Feb-Mar 2017 Oct-Nov-Dec 2017 Scope of work may include patching the roadway with asphalt, repairing damaged curbs and gutters, repairing damaged sidewalks and driveway aprons, installing ADA compliant curb ramps at intersections, and replacing/repairing damaged underground water, sewer and/or drainage lines.
RR084 RR3 - Lakeview North Group B (PMO) CIP Planning A Lakeview $15,936,490.06 Apr-May-Jun 2019 Apr-May-Jun 2020 Scope of work may include repaving the asphalt roadway from curb-to-curb, repairing damaged sidewalks and driveway aprons, installing ADA compliant curb ramps at intersections, and replacing/repairing damaged underground water, sewer and/or drainage lines.
RR085 RR3 - Lakeview North Group C (PMO) CIP Planning A Lakeview $13,050,209.16 Oct-Nov-Dec 2017 Oct-Nov-Dec 2018 Scope of work may include repaving the asphalt roadway from curb-to-curb, repairing damaged sidewalks and driveway aprons, installing ADA compliant curb ramps at intersections, and replacing/repairing damaged underground water, sewer and/or drainage lines.
RR086 RR3 - Lakeview North Group D (FRC) CIP Planning A Lakeview $9,073,850.45 Jul-Aug-Sep 2019 Jul-Aug-Sep 2020 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR087 RR3 - Lakeview North Group E (FRC) CIP Planning A Lakeview $9,152,338.28 Oct-Nov-Dec 2020 Oct-Nov-Dec 2021 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR088 RR3 - Lakeview North Group F (FRC) CIP Planning A Lakeview $8,113,512.09 Jul-Aug-Sep 2021 Jul-Aug-Sep 2022 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR089 RR3 - Lakeview North Group G (FRC) CIP Planning A Lakeview $8,591,175.72 Apr-May-Jun 2022 Apr-May-Jun 2023 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR090 RR3 - Lakeview South Group A (PMOPI) CIP Planning A Lakeview $14,924,484.87 Apr-May-Jun 2017 Apr-May-Jun 2018 Scope of work may include repaving the asphalt roadway from curb-to-curb, replacing damaged portions of concrete with new concrete, patching the roadway with asphalt, repairing damaged sidewalks and driveway aprons, installing ADA compliant curb ramps at intersections, and replacing/repairing damaged underground water, sewer and/or drainage lines.
RR091 RR3 - Lakeview South Group B (FRCPI) CIP Planning A Lakeview $9,628,213.75 Oct-Nov-Dec 2019 Oct-Nov-Dec 2020 Scope of work may include replacing damaged underground water, sewer and drainage lines, repaving the roadway, repaving the asphalt roadway from curb-to-curb, patching the roadway with asphalt, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR094 RR3 - Lakewood Group A (PMOI) CIP Planning A Lakewood $2,709,601.32 Apr-May-Jun 2017 Jan-Feb-Mar 2018 Scope of work may include repaving the asphalt roadway from curb-to-curb, patching the roadway with asphalt, repairing damaged sidewalks and driveway aprons, installing ADA compliant curb ramps at intersections, and replacing/repairing damaged underground water, sewer and/or drainage lines.
RR095 RR3 - Lakewood Group B (FRCP) CIP Planning A Lakewood $6,907,658.12 Jul-Aug-Sep 2019 Jul-Aug-Sep 2020 Scope of work may include replacing damaged underground water, sewer and drainage lines, repaving the roadway, repaving the asphalt roadway from curb-to-curb, patching the roadway with asphalt, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR096 RR3 - Lakewood Group C (FRC) CIP Planning A Lakewood $7,469,452.61 Jan-Feb-Mar 2020 Jan-Feb-Mar 2021 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR097 RR3 - Leonidas Group B (PMOPC) CIP Planning A Leonidas $8,552,890.75 Oct-Nov-Dec 2017 Oct-Nov-Dec 2018 Scope of work may include repaving the asphalt roadway from curb-to-curb, replacing damaged portions of concrete with new concrete, repairing damaged sidewalks and driveway aprons, installing ADA compliant curb ramps at intersections, and replacing/repairing damaged underground water, sewer and/or drainage lines.
RR098 RR3 - Leonidas Group C (FRCPP) CIP Planning A Leonidas $10,498,740.92 Apr-May-Jun 2019 Apr-May-Jun 2020 Scope of work may include replacing damaged underground water, sewer and drainage lines, repaving the roadway, repaving the asphalt roadway from curb-to-curb, replacing damaged portions of concrete with new concrete, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR099 RR3 - Leonidas Group D (FRCPP) CIP Planning A Leonidas $7,956,904.89 Jul-Aug-Sep 2020 Jul-Aug-Sep 2021 Scope of work may include replacing damaged underground water, sewer and drainage lines, repaving the roadway, repaving the asphalt roadway from curb-to-curb, replacing damaged portions of concrete with new concrete, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR100 RR3 - Little Woods Group A (PMOPI) CIP Planning E Little Woods $12,779,459.18 Jul-Aug-Sep 2017 Jul-Aug-Sep 2018 Scope of work may include repaving the asphalt roadway from curb-to-curb, replacing damaged portions of concrete with new concrete, patching the roadway with asphalt, repairing damaged sidewalks and driveway aprons, installing ADA compliant curb ramps at intersections, and replacing/repairing damaged underground water, sewer and/or drainage lines.
RR101 RR3 - Little Woods Group B (FRC) CIP Planning E Little Woods $5,916,361.83 Apr-May-Jun 2019 Apr-May-Jun 2020 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR102 RR3 - Little Woods Group C (FRC) CIP Planning E Little Woods $9,315,522.98 Jul-Aug-Sep 2020 Jul-Aug-Sep 2021 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR103 RR3 - LNW Northeast Group A (INC) CIP Planning E Lower Ninth Ward $7,751,349.73 Jan-Feb-Mar 2017 Apr-May-Jun 2018 Scope of work may include patching the roadway with asphalt, repairing damaged curbs and gutters, repairing damaged sidewalks and driveway aprons, installing ADA compliant curb ramps at intersections, and replacing/repairing damaged underground water, sewer and/or drainage lines.
RR104 RR3 - LNW Northeast Group B (FRCP) CIP Planning E Lower Ninth Ward $10,066,548.49 Apr-May-Jun 2018 Apr-May-Jun 2019 Scope of work may include replacing damaged underground water, sewer and drainage lines, repaving the roadway, repaving the asphalt roadway from curb-to-curb, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR105 RR3 - LNW Northeast Group C (FRC) CIP Planning E Lower Ninth Ward $11,017,599.39 Jul-Aug-Sep 2019 Jul-Aug-Sep 2020 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR106 RR3 - LNW Northeast Group D (FRC) CIP Planning E Lower Ninth Ward $12,318,302.19 Oct-Nov-Dec 2020 Oct-Nov-Dec 2021 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR107 RR3 - LNW Northeast Group E (FRC) CIP Planning E Lower Ninth Ward $5,577,873.43 Jan-Feb-Mar 2022 Jan-Feb-Mar 2023 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR108 RR3 - LNW Northwest Group A (PMOI) CIP Planning E Lower Ninth Ward $5,216,802.26 Apr-May-Jun 2017 Oct-Nov-Dec 2017 Scope of work may include repaving the asphalt roadway from curb-to-curb, patching the roadway with asphalt, repairing damaged sidewalks and driveway aprons, installing ADA compliant curb ramps at intersections, and replacing/repairing damaged underground water, sewer and/or drainage lines.
RR109 RR3 - LNW Northwest Group B (FRC) CIP Planning E Lower Ninth Ward $7,011,308.28 Apr-May-Jun 2018 Apr-May-Jun 2019 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR110 RR3 - LNW Northwest Group C (FRC) CIP Planning E Lower Ninth Ward $8,159,698.98 Jul-Aug-Sep 2019 Jul-Aug-Sep 2020 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR111 RR3 - LNW Northwest Group D (FRC) CIP Planning E Lower Ninth Ward $9,956,394.22 Jan-Feb-Mar 2020 Jan-Feb-Mar 2021 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR112 RR3 - LNW South Group A (PMOI) CIP Planning E Lower Ninth Ward $11,738,841.93 Apr-May-Jun 2018 Apr-May-Jun 2019 Scope of work may include repaving the asphalt roadway from curb-to-curb, patching the roadway with asphalt, repairing damaged sidewalks and driveway aprons, installing ADA compliant curb ramps at intersections, and replacing/repairing damaged underground water, sewer and/or drainage lines.
RR113 RR3 - LNW South Group C (FRC) CIP Planning E Lower Ninth Ward $8,979,764.23 Jul-Aug-Sep 2019 Jul-Aug-Sep 2020 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR114 RR3 - LNW South Group D (FRC) CIP Planning E Lower Ninth Ward $9,866,192.56 Oct-Nov-Dec 2020 Oct-Nov-Dec 2021 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR115 RR3 - LNW South Group E (FRC) CIP Planning E Lower Ninth Ward $11,542,931.47 Jan-Feb-Mar 2021 Jan-Feb-Mar 2022 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR116 RR3 - Marlyville-Fontainebleau Group A (PMOPI) CIP Planning AB Marlyville & Fontainbleau $22,151,531.46 Apr-May-Jun 2017 Apr-May-Jun 2018 Scope of work may include repaving the asphalt roadway from curb-to-curb, replacing damaged portions of concrete with new concrete, patching the roadway with asphalt, repairing damaged sidewalks and driveway aprons, installing ADA compliant curb ramps at intersections, and replacing/repairing damaged underground water, sewer and/or drainage lines.
RR117 RR3 - Marlyville-Fontainebleau Group B (FRC) CIP Planning AB Marlyville & Fontainbleau $2,784,039.33 Oct-Nov-Dec 2021 Oct-Nov-Dec 2022 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR118 RR3 - Marlyville-Fontainebleau Group C (FRC) CIP Planning AB Marlyville & Fontainbleau $3,897,831.18 Oct-Nov-Dec 2018 Oct-Nov-Dec 2019 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR119 RR3 - Marlyville-Fontainebleau Group D (FRC) CIP Planning AB Marlyville & Fontainbleau $4,998,364.44 Jan-Feb-Mar 2019 Jan-Feb-Mar 2020 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR120 RR3 - Marlyville-Fontainebleau Group E (FRC) CIP Planning AB Marlyville & Fontainbleau $5,489,925.66 Jul-Aug-Sep 2019 Jul-Aug-Sep 2020 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR121 RR3 - Marlyville-Fontainebleau Group F (FRC) CIP Planning AB Marlyville & Fontainbleau $5,441,419.17 Oct-Nov-Dec 2020 Oct-Nov-Dec 2021 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR122 RR3 - Marlyville-Fontainebleau Group G (FRC) CIP Planning AB Marlyville & Fontainbleau $6,656,773.83 Apr-May-Jun 2021 Apr-May-Jun 2022 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR123 RR3 - Marlyville-Fontainebleau Group H (FRC) CIP Planning AB Marlyville & Fontainbleau $6,763,226.61 Apr-May-Jun 2022 Apr-May-Jun 2023 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR124 RR3 - Mid City Group A (INC) CIP Planning AB Mid-City $8,508,101.31 Jan-Feb-Mar 2017 Oct-Nov-Dec 2017 Scope of work may include patching the roadway with asphalt, repairing damaged curbs and gutters, repairing damaged sidewalks and driveway aprons, installing ADA compliant curb ramps at intersections, and replacing/repairing damaged underground water, sewer and/or drainage lines.
RR125 RR3 - Mid City Group B (PMOPC) CIP Planning AB Mid-City $25,229,744.22 Apr-May-Jun 2018 Apr-May-Jun 2019 Scope of work may include repaving the asphalt roadway from curb-to-curb, replacing damaged portions of concrete with new concrete, repairing damaged sidewalks and driveway aprons, installing ADA compliant curb ramps at intersections, and replacing/repairing damaged underground water, sewer and/or drainage lines.
RR126 RR3 - Mid City Group C (FRC) CIP Planning AB Mid-City $5,668,034.72 Jul-Aug-Sep 2019 Jul-Aug-Sep 2020 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR127 RR3 - Mid City Group D (FRC) CIP Planning AB Mid-City $7,501,377.41 Jul-Aug-Sep 2019 Jul-Aug-Sep 2020 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR128 RR3 - Mid City Group E (FRC) CIP Planning AB Mid-City $7,056,332.45 Jul-Aug-Sep 2020 Jul-Aug-Sep 2021 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR129 RR3 - Milan Group A (PMOPI) CIP Planning B Milan $7,761,550.24 Jan-Feb-Mar 2018 Jan-Feb-Mar 2019 Scope of work may include repaving the asphalt roadway from curb-to-curb, replacing damaged portions of concrete with new concrete, patching the roadway with asphalt, repairing damaged sidewalks and driveway aprons, installing ADA compliant curb ramps at intersections, and replacing/repairing damaged underground water, sewer and/or drainage lines.
RR130 RR3 - Milneburg Group A (PMOPI) CIP Planning D Milneburg $15,762,848.32 Apr-May-Jun 2017 Apr-May-Jun 2018 Scope of work may include repaving the asphalt roadway from curb-to-curb, replacing damaged portions of concrete with new concrete, patching the roadway with asphalt, repairing damaged sidewalks and driveway aprons, installing ADA compliant curb ramps at intersections, and replacing/repairing damaged underground water, sewer and/or drainage lines.
RR131 RR3 - Milneburg Group B (FRC) CIP Planning D Milneburg $7,725,090.62 Jul-Aug-Sep 2018 Jul-Aug-Sep 2019 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR132 RR3 - Navarre Group A (FRCPI) CIP Planning A Navarre $8,157,780.15 Jan-Feb-Mar 2017 Jan-Feb-Mar 2018 Scope of work may include replacing damaged underground water, sewer and drainage lines, repaving the roadway, repaving the asphalt roadway from curb-to-curb, patching the roadway with asphalt, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR133 RR3 - Pines Village Group A (PMOI) CIP Planning D Pines Village $17,216,566.30 Jan-Feb-Mar 2017 Apr-May-Jun 2018 Scope of work may include repaving the asphalt roadway from curb-to-curb, patching the roadway with asphalt, repairing damaged sidewalks and driveway aprons, installing ADA compliant curb ramps at intersections, and replacing/repairing damaged underground water, sewer and/or drainage lines.
RR134 RR3 - Pines Village Group B (FRC) CIP Planning D Pines Village $3,419,621.68 Jul-Aug-Sep 2018 Jul-Aug-Sep 2019 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR135 RR3 - Pines Village Group C (FRC) CIP Planning D Pines Village $8,218,796.52 Oct-Nov-Dec 2019 Oct-Nov-Dec 2020 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR136 RR3 - Plum Orchard Group C (FRC) CIP Planning E Plum Orchard $5,812,375.93 Oct-Nov-Dec 2018 Oct-Nov-Dec 2019 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR137 RR3 - Plum Orchard Group D (FRC) CIP Planning E Plum Orchard $3,689,485.21 Apr-May-Jun 2019 Apr-May-Jun 2020 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR138 RR3 - Plum Orchard/West Lake Forest Group A (PMOPI) CIP Planning E Plum Orchard, West Lake Forest $12,011,778.47 Oct-Nov-Dec 2017 Oct-Nov-Dec 2018 Scope of work may include repaving the asphalt roadway from curb-to-curb, replacing damaged portions of concrete with new concrete, patching the roadway with asphalt, repairing damaged sidewalks and driveway aprons, installing ADA compliant curb ramps at intersections, and replacing/repairing damaged underground water, sewer and/or drainage lines.
RR139 RR3 - Plum Orchard/West Lake Forest Group B (PMOPI) CIP Planning E Plum Orchard, West Lake Forest $12,035,627.78 Apr-May-Jun 2018 Apr-May-Jun 2019 Scope of work may include repaving the asphalt roadway from curb-to-curb, replacing damaged portions of concrete with new concrete, patching the roadway with asphalt, repairing damaged sidewalks and driveway aprons, installing ADA compliant curb ramps at intersections, and replacing/repairing damaged underground water, sewer and/or drainage lines.
RR140 RR3 - Pontchartrain Park Group A (PMOI) CIP Planning D Pontchartrain Park $10,829,460.21 Oct-Nov-Dec 2017 Oct-Nov-Dec 2018 Scope of work may include repaving the asphalt roadway from curb-to-curb, patching the roadway with asphalt, repairing damaged sidewalks and driveway aprons, installing ADA compliant curb ramps at intersections, and replacing/repairing damaged underground water, sewer and/or drainage lines.
RR141 RR3 - Pontchartrain Park Group B (FRCP) CIP Planning D Pontchartrain Park $5,230,959.81 Apr-May-Jun 2019 Apr-May-Jun 2020 Scope of work may include replacing damaged underground water, sewer and drainage lines, repaving the roadway, repaving the asphalt roadway from curb-to-curb, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR142 RR3 - Pontchartrain Park Group C (FRC) CIP Planning D Pontchartrain Park $7,735,786.07 Oct-Nov-Dec 2019 Jan-Feb-Mar 2021 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR143 RR3 - Pontchartrain Park Group D (FRC) CIP Planning D Pontchartrain Park $6,139,749.06 Apr-May-Jun 2020 Apr-May-Jun 2021 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR144 RR3 - Read Blvd East Group A (PMOPI) CIP Planning E Read Blvd East $12,922,417.34 Apr-May-Jun 2017 Jul-Aug-Sep 2018 Scope of work may include repaving the asphalt roadway from curb-to-curb, replacing damaged portions of concrete with new concrete, patching the roadway with asphalt, repairing damaged sidewalks and driveway aprons, installing ADA compliant curb ramps at intersections, and replacing/repairing damaged underground water, sewer and/or drainage lines.
RR145 RR3 - Read Blvd East Group B (PC) CIP Planning E Read Blvd East $12,371,985.76 Jan-Feb-Mar 2018 Jan-Feb-Mar 2019 Scope of work may include replacing damaged portions of concrete with new concrete, repairing damaged sidewalks and driveway aprons, installing ADA compliant curb ramps at intersections, and replacing/repairing damaged underground water, sewer and/or drainage lines.
RR146 RR3 - Read Blvd East Group C (PC) CIP Planning E Read Blvd East $7,908,339.65 Apr-May-Jun 2018 Apr-May-Jun 2019 Scope of work may include replacing damaged portions of concrete with new concrete, repairing damaged sidewalks and driveway aprons, installing ADA compliant curb ramps at intersections, and replacing/repairing damaged underground water, sewer and/or drainage lines.
RR147 RR3 - Read Blvd East Group D (PMOPC) CIP Planning E Read Blvd East $11,328,747.42 Jul-Aug-Sep 2018 Jul-Aug-Sep 2019 Scope of work may include repaving the asphalt roadway from curb-to-curb, replacing damaged portions of concrete with new concrete, repairing damaged sidewalks and driveway aprons, installing ADA compliant curb ramps at intersections, and replacing/repairing damaged underground water, sewer and/or drainage lines.
RR148 RR3 - Read Blvd East Group E (FRC) CIP Planning E Read Blvd East $8,218,921.18 Oct-Nov-Dec 2018 Oct-Nov-Dec 2019 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR149 RR3 - Read Blvd East Group F (PC) CIP Planning E Read Blvd East $6,160,807.77 Oct-Nov-Dec 2018 Oct-Nov-Dec 2019 Scope of work may include replacing damaged portions of concrete with new concrete, repairing damaged sidewalks and driveway aprons, installing ADA compliant curb ramps at intersections, and replacing/repairing damaged underground water, sewer and/or drainage lines.
RR150 RR3 - Read Blvd East Group G (FRC) CIP Planning E Read Blvd East $4,197,594.28 Jan-Feb-Mar 2019 Jan-Feb-Mar 2020 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR152 RR3 - Read Blvd West Group A (PMOI) CIP Planning E Read Blvd West $11,135,419.81 Jan-Feb-Mar 2017 Oct-Nov-Dec 2017 Scope of work may include repaving the asphalt roadway from curb-to-curb, patching the roadway with asphalt, repairing damaged sidewalks and driveway aprons, installing ADA compliant curb ramps at intersections, and replacing/repairing damaged underground water, sewer and/or drainage lines.
RR153 RR3 - Read Blvd West Group C (PMOPC) CIP Planning E Read Blvd West $15,595,558.27 Jul-Aug-Sep 2017 Jul-Aug-Sep 2018 Scope of work may include repaving the asphalt roadway from curb-to-curb, replacing damaged portions of concrete with new concrete, repairing damaged sidewalks and driveway aprons, installing ADA compliant curb ramps at intersections, and replacing/repairing damaged underground water, sewer and/or drainage lines.
RR156 RR3 - St. Anthony East Group B (FRC) CIP Planning D St. Anthony $6,709,576.82 Oct-Nov-Dec 2019 Oct-Nov-Dec 2020 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR157 RR3 - St. Anthony East Group C (FRC) CIP Planning D St. Anthony $6,069,261.77 Apr-May-Jun 2018 Apr-May-Jun 2019 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR158 RR3 - St. Anthony East Group D (FRC) CIP Planning D St. Anthony $6,000,363.34 Jul-Aug-Sep 2021 Jul-Aug-Sep 2022 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR159 RR3 - St. Anthony Group A (PMOPI) CIP Planning D St. Anthony $17,709,437.53 Jul-Aug-Sep 2017 Jul-Aug-Sep 2018 Scope of work may include repaving the asphalt roadway from curb-to-curb, replacing damaged portions of concrete with new concrete, patching the roadway with asphalt, repairing damaged sidewalks and driveway aprons, installing ADA compliant curb ramps at intersections, and replacing/repairing damaged underground water, sewer and/or drainage lines.
RR160 RR3 - St. Anthony West Group B (FRC) CIP Planning D St. Anthony $5,451,177.32 Jan-Feb-Mar 2019 Jan-Feb-Mar 2020 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR161 RR3 - St. Anthony West Group C (FRC) CIP Planning D St. Anthony $5,487,307.56 Oct-Nov-Dec 2020 Oct-Nov-Dec 2021 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR162 RR3 - St. Anthony West Group D (FRC) CIP Planning D St. Anthony $4,488,082.05 Apr-May-Jun 2020 Apr-May-Jun 2021 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR163 RR3 - St. Anthony West Group E (FRC) CIP Planning D St. Anthony $4,855,219.03 Apr-May-Jun 2021 Apr-May-Jun 2022 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR164 RR3 - St. Anthony West Group F (FRC) CIP Planning D St. Anthony $6,711,854.30 Oct-Nov-Dec 2021 Oct-Nov-Dec 2022 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR165 RR3 - St. Bernard Group A (VAR) CIP Planning D St. Bernard Area $4,803,380.92 Jul-Aug-Sep 2017 Jul-Aug-Sep 2018 Scope of work may include replacing damaged underground water, sewer and drainage lines, repaving the roadway, repaving the asphalt roadway from curb-to-curb, replacing damaged portions of concrete with new concrete, patching the roadway with asphalt, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR166 RR3 - St. Claude Group A (PMOI) CIP Planning CD St. Claude $9,417,215.10 Apr-May-Jun 2017 Apr-May-Jun 2018 Scope of work may include repaving the asphalt roadway from curb-to-curb, patching the roadway with asphalt, repairing damaged sidewalks and driveway aprons, installing ADA compliant curb ramps at intersections, and replacing/repairing damaged underground water, sewer and/or drainage lines.
RR167 RR3 - St. Claude Group B (PMOI) CIP Planning CD St. Claude $4,581,663.56 Oct-Nov-Dec 2017 Oct-Nov-Dec 2018 Scope of work may include repaving the asphalt roadway from curb-to-curb, patching the roadway with asphalt, repairing damaged sidewalks and driveway aprons, installing ADA compliant curb ramps at intersections, and replacing/repairing damaged underground water, sewer and/or drainage lines.
RR168 RR3 - St. Claude Group C (FRC) CIP Planning CD St. Claude $8,634,273.11 Apr-May-Jun 2018 Apr-May-Jun 2019 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR169 RR3 - St. Claude Group D (FRC) CIP Planning CD St. Claude $2,443,655.80 Jan-Feb-Mar 2019 Jan-Feb-Mar 2020 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR170 RR3 - St. Claude Group E (FRC) CIP Planning CD St. Claude $7,522,130.98 Jul-Aug-Sep 2018 Jul-Aug-Sep 2019 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR171 RR3 - St. Claude Group F (FRC) CIP Planning CD St. Claude $3,812,733.75 Apr-May-Jun 2020 Apr-May-Jun 2021 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR172 RR3 - St. Claude Group G (FRC) CIP Planning CD St. Claude $8,897,044.21 Apr-May-Jun 2019 Apr-May-Jun 2020 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR173 RR3 - St. Claude Group H (FRC) CIP Planning CD St. Claude $6,252,283.16 Apr-May-Jun 2020 Apr-May-Jun 2021 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR174 RR3 - St. Claude Group I (FRC) CIP Planning CD St. Claude $5,323,391.37 Jul-Aug-Sep 2021 Jul-Aug-Sep 2022 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR175 RR3 - St. Claude Group J (FRC) CIP Planning CD St. Claude $5,079,225.65 Oct-Nov-Dec 2022 Oct-Nov-Dec 2023 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR176 RR3 - St. Roch North Group A (PMOI) CIP Planning CD St. Roch $10,921,645.54 Jan-Feb-Mar 2018 Jan-Feb-Mar 2019 Scope of work may include repaving the asphalt roadway from curb-to-curb, patching the roadway with asphalt, repairing damaged sidewalks and driveway aprons, installing ADA compliant curb ramps at intersections, and replacing/repairing damaged underground water, sewer and/or drainage lines.
RR177 RR3 - St. Roch North Group B (FRC) CIP Planning CD St. Roch $5,165,473.30 Apr-May-Jun 2019 Jul-Aug-Sep 2020 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR178 RR3 - St. Roch North Group C (FRC) CIP Planning CD St. Roch $3,718,705.08 Oct-Nov-Dec 2020 Oct-Nov-Dec 2021 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR179 RR3 - St. Roch North Group D (FRC) CIP Planning CD St. Roch $4,984,860.00 Apr-May-Jun 2021 Apr-May-Jun 2022 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR180 RR3 - St. Roch South Group A (PMOI) CIP Planning CD St. Roch $9,341,605.51 Jul-Aug-Sep 2017 Jul-Aug-Sep 2018 Scope of work may include repaving the asphalt roadway from curb-to-curb, patching the roadway with asphalt, repairing damaged sidewalks and driveway aprons, installing ADA compliant curb ramps at intersections, and replacing/repairing damaged underground water, sewer and/or drainage lines.
RR181 RR3 - St. Roch South Group B (FRC) CIP Planning CD St. Roch $7,980,521.54 Oct-Nov-Dec 2018 Oct-Nov-Dec 2019 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR182 RR3 - Treme-Lafitte Group A (INC) CIP Planning CD Treme - Lafitte $5,419,262.75 Jan-Feb-Mar 2017 Oct-Nov-Dec 2017 Scope of work may include patching the roadway with asphalt, repairing damaged curbs and gutters, repairing damaged sidewalks and driveway aprons, installing ADA compliant curb ramps at intersections, and replacing/repairing damaged underground water, sewer and/or drainage lines.
RR183 RR3 - Treme-Lafitte Group B (FRCPP) CIP Planning CD Treme - Lafitte $9,324,323.81 Jan-Feb-Mar 2018 Apr-May-Jun 2019 Scope of work may include replacing damaged underground water, sewer and drainage lines, repaving the roadway, repaving the asphalt roadway from curb-to-curb, replacing damaged portions of concrete with new concrete, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR184 RR3 - Uptown Group B (FRC) CIP Planning B Uptown $4,763,729.64 Jan-Feb-Mar 2023 Jan-Feb-Mar 2024 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR185 RR3 - Uptown, West Riverside Group A (PMOPI) CIP Planning B Uptown $11,481,567.13 Apr-May-Jun 2017 Apr-May-Jun 2018 Scope of work may include repaving the asphalt roadway from curb-to-curb, replacing damaged portions of concrete with new concrete, patching the roadway with asphalt, repairing damaged sidewalks and driveway aprons, installing ADA compliant curb ramps at intersections, and replacing/repairing damaged underground water, sewer and/or drainage lines.
RR186 RR3 - Viavant-Lake Catherine Group C (VAR) CIP Planning E Viavant $7,766,697.62 Jan-Feb-Mar 2018 Jan-Feb-Mar 2019 Scope of work may include replacing damaged underground water, sewer and drainage lines, repaving the roadway, repaving the asphalt roadway from curb-to-curb, replacing damaged portions of concrete with new concrete, patching the roadway with asphalt, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR187 RR3 - Village De L'Est Group A (PMOI) CIP Planning E Village de Lest $9,545,699.21 Jan-Feb-Mar 2017 Jan-Feb-Mar 2018 Scope of work may include repaving the asphalt roadway from curb-to-curb, patching the roadway with asphalt, repairing damaged sidewalks and driveway aprons, installing ADA compliant curb ramps at intersections, and replacing/repairing damaged underground water, sewer and/or drainage lines.
RR188 RR3 - Village De L'Est Group B (PMOPC) CIP Planning E Village de Lest $8,719,398.12 Apr-May-Jun 2018 Apr-May-Jun 2019 Scope of work may include repaving the asphalt roadway from curb-to-curb, replacing damaged portions of concrete with new concrete, repairing damaged sidewalks and driveway aprons, installing ADA compliant curb ramps at intersections, and replacing/repairing damaged underground water, sewer and/or drainage lines.
RR189 RR3 - Village De L'Est Group C (FRC) CIP Planning E Village de Lest $7,894,524.45 Jul-Aug-Sep 2018 Jul-Aug-Sep 2019 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR191 RR3 - West Bank Group A (VAR) CIP Planning C West Bank Neighborhoods $11,134,693.37 Apr-May-Jun 2018 Apr-May-Jun 2019 Scope of work may include replacing damaged underground water, sewer and drainage lines, repaving the roadway, repaving the asphalt roadway from curb-to-curb, replacing damaged portions of concrete with new concrete, patching the roadway with asphalt, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR192 RR3 - West Bank Group B (VAR) CIP Planning C West Bank Neighborhoods $8,227,230.02 Apr-May-Jun 2017 Apr-May-Jun 2018 Scope of work may include replacing damaged underground water, sewer and drainage lines, repaving the roadway, repaving the asphalt roadway from curb-to-curb, replacing damaged portions of concrete with new concrete, patching the roadway with asphalt, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR193 RR3 - West End Group A (PMOPI) CIP Planning A West End $11,115,296.99 Apr-May-Jun 2017 Apr-May-Jun 2018 Scope of work may include repaving the asphalt roadway from curb-to-curb, replacing damaged portions of concrete with new concrete, patching the roadway with asphalt, repairing damaged sidewalks and driveway aprons, installing ADA compliant curb ramps at intersections, and replacing/repairing damaged underground water, sewer and/or drainage lines.
RR194 RR3 - West End Group B (FRC) CIP Planning A West End $6,488,802.66 Jan-Feb-Mar 2018 Apr-May-Jun 2019 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR195 RR3 - West End Group C (FRC) CIP Planning A West End $8,349,886.17 Jul-Aug-Sep 2018 Jul-Aug-Sep 2019 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR196 RR3 - West End Group D (FRC) CIP Planning A West End $5,568,368.05 Apr-May-Jun 2019 Apr-May-Jun 2020 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR197 RR3 - West End Group E (FRC) CIP Planning A West End $5,269,417.34 Jan-Feb-Mar 2020 Jan-Feb-Mar 2021 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR198 RR3 - West End Group F (FRC) CIP Planning A West End $8,559,610.89 Jan-Feb-Mar 2021 Apr-May-Jun 2022 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR199 RR3 - West End Group G (FRC) CIP Planning A West End $4,165,890.07 Apr-May-Jun 2021 Apr-May-Jun 2022 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
RR200 RR3 - West Lake Forest Group A (FRC) CIP Planning E West Lake Forest $2,085,317.09 Oct-Nov-Dec 2018 Oct-Nov-Dec 2019 Scope of work includes replacing damaged underground water, sewer and drainage lines, repaving the roadway, replacing damaged sidewalks and driveway aprons, and installing ADA compliant curb ramps at intersections.
DPW386 S Peters St (Canal - Calliope St) PTP Complete B Central Business District $1,294,920.00 24-Mar-14 A 17-Oct-14 A Remove and  replace existing roadway, install new American  with Disabilities Act-compliant curb ramps. Visit www.pavinglaroads.com for additional  detail.
DPW458 S. Dupre (Canal - Tulane) & Gayoso (Canal - Banks) City Funded Design B Mid-City $4,968,018.00 Jan-Feb-Mar 2017 Jul-Aug-Sep 2017 Reconstruction of existing roadway, including the replacement of affected  utilities.
DPW441 S. Galvez St. (Martin Luther King Blvd. - Toledano) CDBG Funded Design B Central City $6,000,000.00 Jan-Feb-Mar 2017 Oct-Nov-Dec 2017 Full reconstruction of concrete  roadway including all underground utilities. Installation of ADA compliant curb  ramps, new sidewalks, driveways, landscaping, street lights and striping of  crosswalks and a dedicated bike lane.
DPW264 S. Galvez Street ( Earhart- Toledano) Bikeway City Funded Design B Broadmoor $9,300.00 Jul-Aug-Sep 2017 Oct-Nov-Dec 2017 Install new pavement markings and  signage
DPW176 S. Jeff. Davis (M. L. King Jr. - Howard) City Funded Complete B Gert Town $2,088,244.06 10-Oct-11 A 30-Mar-12 A Reconstruction of existing roadway, including the  replacement of affected utilities.
DPW362 S. Jefferson Davis Pkwy (Gravier - Canal) PTP Complete B Tulane - Gravier $1,036,904.00 06-Nov-13 A 12-Mar-14 A Remove and  replace existing roadway, install new American  with Disabilities Act-compliant curb ramps. Visit www.pavinglaroads.com for additional  detail.
DPW406 S. Jefferson Davis Pkwy Bridge Ramp Repairs PTP Complete B Gert Town $325,000.00 12-May-14 A 30-Jul-14 A Removal  and replacement of the sidewalk intersections for the installation of the  compliant ADA ramps and the installation of the ADA ramps in the  medians.
DPW092 S. Johnson St (Jefferson - Claiborne), Melodia (Claiborne - S. Johnson) City Funded Bid & Award A Audubon $2,200,000.00 1-Nov-16 Jan-Feb-Mar 2017 Reconstruction of existing roadway,  including the replacement of affected utilities.
DPW418 S. Tonti St. (Julia - Old Poydras) CDBG Funded Complete B Tulane - Gravier $36,905.00 21-Jul-14 A 14-Aug-14 A Rehabilitation of asphalt pavement including mill, patching, and 2-inch  overlay. Additional improvements include sidewalk repair, construction of ADA  ramps, installation of high-visibility crosswalks, and other roadway  striping.
PWF055 School Zone Flashing Beacons City Funded Complete ABCDE City Wide $1,637,650.44 05-Aug-08 A 29-Nov-10 A Repair and/or replacement of damaged  school zone flashers with new solar-powered flashers
DPW521 Senate (St. Bernard - Davey) City Funded Complete D St. Bernard Area $129,043.20 15-Jun-15 A 15-Jul-15 A Asphalt  Patching and Mill Overlay
DPW541 Shirley Dr. at General DeGaulle City Funded Complete C Behrman $59,349.07 13-Jul-15 A 24-Jul-15 A Concrete panel replacement and manhole adjustments.
DPW412 Short (Washington - Palm) CDBG Funded Complete A Gert Town $99,961.25 03-Jul-14 A 25-Jul-14 A Rehabilitation of asphalt pavement including mill, patching, and 2-inch  overlay. Additional improvements include sidewalk repair, construction of ADA  ramps, installation of high-visibility crosswalks, and other roadway  striping.
DPW187 St. Anthony Path Landscape (Mirabeau - Pelopidas) CDBG Funded Complete CD Dillard $597,690.85 14-May-12 A 22-Jan-13 A An enhancement project that may include: Extending the median along St  Anthony Ave from Mirabeau Ave to Pelopidas Ave, widening the median to  accommodate the new walking path, additional planting of trees along the walking  path from Pelopidas Ave to Gentilly Blvd, adding a walking path along St Anthony  Ave from Gentilly Blvd to Interstate 610.
DPW188 St. Bernard Ave Streetscape (N. Claiborne - North Miro St) CDBG Funded Complete CD Seventh Ward $389,697.00 27-May-14 A 27-Oct-14 A May include sidewalk or other  pedestrian walkway improvements, bikeways, traffic and pedestrian signage or  signalization, landscaping, lighting, or public art.
DPW291 St. Bernard Ave. (Filmore Ave. to Robert E. Lee Blvd.) City Funded Construction D Filmore $9,474,637.67 27-Apr-15 A Oct-Nov-Dec 2016 Reconstruction of existing roadway, including the replacement of  affected utilities.
DPW189 St. Bernard Ave. (I-610 - Filmore Ave.) PTP Complete D St. Bernard Area $3,228,389.00 20-Nov-09 A 02-May-11 A Rehabilitation of roadway by milling  existing surface and overlay with new asphalt, including pre-milling patching  repairs as well as adjustment of utility manholes, where applicable.
DPW348 St. Bernard Ave. (N. Rampart - Sere) PTP Complete CD Seventh Ward $3,940,205.00 01-Jun-13 A 17-Oct-13 A Remove and  replace existing roadway, install new American  with Disabilities Act-compliant curb ramps. Visit www.pavinglaroads.com for additional  detail.
DPW184 St. Charles Ave (Calliope St - Louisiana Ave) Federal Design B Central City $4,756,233.50 Apr-May-Jun 2017 Apr-May-Jun 2018 Rehabilitation of roadway by milling  existing surface and overlay with new asphalt, including pre-milling patching  repairs as well as adjustment of utility manholes, where applicable.
DPW324 St. Charles Ave (Louisiana Ave - Nashville) Federal Design B Milan & Touro Neighborhoods $2,900,000.00 Jan-Feb-Mar 2018 Jan-Feb-Mar 2019 Rehabilitation of roadway by milling  existing surface and overlay with new asphalt, including pre-milling patching  repairs as well as adjustment of utility manholes, where applicable.
DPW190 St. Charles Ave (Nashville Ave - S. Carrollton Ave) PTP Complete A Uptown $3,035,595.00 03-Aug-09 A 06-Oct-10 A Rehabilitation of roadway by milling existing surface and  overlay with new asphalt, including pre-milling patching repairs as well as  adjustment of utility manholes, where applicable, installation of ADA  ramps.
DPW281 St. Charles Ave (Nashville Ave - S. Carrollton) Bikeway City Funded Complete A Audubon $30,752.70 28-Jan-13 A 01-Feb-13 A Install new pavement markings and  signage
DPW330 St. Charles Ave (S. Carrollton - Leake) & S. Carrollton (St Charles - Leake) Roadway Rehabilitation City Funded Complete A Audubon $74,030.00 17-May-10 A 10-Jun-10 A Asphalt  pavement, base repair and curb replacement.
DPW191 St. Charles Ave. (Canal St - US 90) PTP Complete B Central Business District $958,678.00 03-Nov-09 A 10-Dec-11 A Rehabilitation of roadway by milling existing surface and  overlay with new asphalt, including pre-milling patching repairs as well as  adjustment of utility manholes, where applicable, installation of ADA  ramps.
DPW444 St. Claude Drainage Improvements (Montegut, Urqhart, Feliciana, Marias) CDBG Funded Design C St. Claude $1,500,000.00 Jan-Feb-Mar 2017 Oct-Nov-Dec 2017 May include subsurface drainage improvements, installation of green infrastructure, 2 inch mill and  overlay and installation of ADA compliant curb ramps.
DPW520 St. Dennis (St. Bernard - Encampment) City Funded Complete D St. Bernard Area $273,120.30 15-Jun-15 A 10-Jul-15 A Asphalt  Patching and Mill Overlay
DPW375 St. Louis St. (Dauphine - Decatur) PTP Complete C French Quarter $449,782.00 23-Jul-12 A 31-Dec-12 A Remove and  replace existing roadway, install new American  with Disabilities Act-compliant curb ramps. Visit www.pavinglaroads.com for additional  detail.
DPW370 St. Louis St. (N Rampart - Dauphine) PTP Complete C French Quarter $311,111.00 16-Jul-12 A 31-Dec-12 A Remove and  replace existing roadway, install new American  with Disabilities Act-compliant curb ramps. Visit www.pavinglaroads.com for additional  detail.
DPW450 St. Louis St. (N. Claiborne - Broad) CDBG Funded Complete D Treme - Lafitte $739,758.20 13-May-15 A 12-Feb-16 A This project will accomplish the rehabilitation of  asphalt pavement including, milling, full depth patching and 2-inch overlay,  clearing and sealing of joints and curb repair. Additional improvements may  include features to improve access for all users such as sidewalk repair, construction of ADA ramps,  installation of high-visibility crosswalks and other roadway striping, and  installation of new way finding and other street  signage.
DPW185 St. Roch and St. Claude Roadway Improvements (St. Claude Ave. - N. Roman St.) CDBG Funded Complete CD St. Roch $702,469.18 11-Jan-10 A 01-Nov-10 A Rehabilitation of roadway by milling existing surface and  overlay with new asphalt, including pre-milling patching repairs as well as  adjustment of utility manholes, where applicable, installation of ADA ramps  including street name tiles.
DPW549 St. Roch Drainage Upgrades Federal Design D St. Roch $7,500,000.00 Oct-Nov-Dec 2017 Jul-Aug-Sep 2018 This  project is intended to help alleviate flooding by increasing the capacity of  subsurface drainage between local streets and trunk lines as well as by using  green infrastructure options which may include retention/detention basins,  street basins, rain gardens, and streetside bioswales.
DPW326 St. Roch/St. Claude Intersection Revitalization Federal Complete C St. Roch $210,843.00 31-Jan-13 A 18-Mar-13 A May include sidewalk or other pedestrian walkway  improvements, bikeways, traffic and pedestrian signage or signalization,  landscaping, lighting, or public art.
DPW410 Stroelitz (Joliet - Dublin) CDBG Funded Complete A Gert Town $188,324.13 11-Jul-14 A 31-Jul-14 A Rehabilitation of asphalt pavement including mill, patching, and 2-inch  overlay. Additional improvements include sidewalk repair, construction of ADA  ramps, installation of high-visibility crosswalks, and other roadway  striping.
DPW401 Sullen Pl (Gen DeGaulle - Patterson) PTP Complete C Old Aurora $2,595,700.00 05-Jan-15 A 06-Jun-15 A Remove and  replace existing roadway, install new American  with Disabilities Act-compliant curb ramps. Visit www.pavinglaroads.com for additional  detail.
DPW423 Sumner (Lawrence - Newton) CDBG Funded Complete C Behrman $700,655.85 07-Aug-14 A 03-Sep-14 A Rehabilitation of asphalt pavement including mill, patching, and 2-inch  overlay. Additional improvements include sidewalk repair, construction of ADA  ramps, installation of high-visibility crosswalks, and other roadway  striping.
DPW422 Sumner (Mardi Gras - Lawrence) CDBG Funded Complete C Whitney $105,851.00 13-Oct-14 A 07-Nov-14 A Rehabilitation of concrete pavement  including panel patching/replacements, clearing and sealing of joints, crack  sealing and curb repair. Additional improvements include sidewalk repair,  construction of ADA ramps, installation of high-visibility crosswalks and other  roadway striping.
DPW561 Tchoupitoulas - Signage and Striping City Funded Design AB Lower Garden District $493,751.50 Apr-May-Jun 2017 Jul-Aug-Sep 2017 Replacement of signage  and striping on the Tchoupitoulas Corridor between Calliope/US90B and Henry Clay  Avenue.  This corridor includes Religious Street between Race and Felicity  streets.  Project to include high-visibility crosswalks and other intersection  striping.
DPW513 Tchoupitoulas (Austerlitz - General Taylor) City Funded Complete B East Riverside $5,974.50 03-Nov-14 A 31-Dec-14 A Concrete panel replacement and  installation of ADA ramps.
DPW195 Tchoupitoulas St (Canal St - Calliope St) Federal Complete B Central Business District $1,477,214.26 20-Mar-12 A 30-Jun-12 A Rehabilitation of roadway by milling  existing surface and overlay with new asphalt, including pre-milling patching  repairs as well as adjustment of utility manholes, where applicable.
DPW376 Toulouse St. (Dauphine - Decatur) PTP Complete C French Quarter $314,017.00 23-Jul-12 A 31-Dec-12 A Remove and  replace existing roadway, install new American  with Disabilities Act-compliant curb ramps. Visit www.pavinglaroads.com for additional  detail.
DPW371 Toulouse St. (N Rampart - Dauphine) PTP Complete C French Quarter $315,191.00 16-Jul-12 A 31-Dec-12 A Remove and  replace existing roadway, install new American  with Disabilities Act-compliant curb ramps. Visit www.pavinglaroads.com for additional  detail.
DPW196 Tulane Ave and Jeff. Davis Pkwy Streetscape - Baudin St, Clark, and D'hemecourt CDBG Funded Complete B Mid-City $138,199.60 14-May-12 A 11-Nov-12 A May include sidewalk or other  pedestrian walkway improvements, bikeways, traffic and pedestrian signage or  signalization, landscaping, lighting, or public art.
DPW341 Tupelo St. (Douglass St. - St. Claude Ave.) PTP Complete E Lower Ninth Ward $338,763.00 09-Jul-12 A 01-Nov-12 A Remove and  replace existing roadway, install new American  with Disabilities Act-compliant curb ramps. Visit www.pavinglaroads.com for additional  detail.
DPW502 University Lakefront Bicycle Boulevard City Funded Complete D Filmore $334,779.40 14-Dec-15 A 30-Apr-16 A Install new pavement markings and signage on  Cartier (Filmore - Burbank), Burbank (Cartier -  Paris).
DPW242 Urquhart St. (Elysian Fields Ave - Franklin Ave) City Funded Complete C St. Roch $3,726,142.31 14-Feb-11 A 11-Nov-11 A Reconstruction of existing roadway, including the replacement of affected  utilities.
DPW559 Urquhart St. (Poland - Japonica) CDBG Funded Complete D Bywater $125,000.00 01-Aug-16 A 13-Sep-16 A This project will accomplish the rehabilitation of  asphalt pavement including, milling, full depth patching and 2-inch overlay,  clearing and sealing of joints and curb repair. Additional improvements may  include features to improve access for all users such as sidewalk repair, construction of ADA ramps,  installation of high-visibility crosswalks and other roadway striping, and  installation of new way finding and other street  signage.
DPW531 Valmont (Magazine - Constance) City Funded Complete B West Riverside $25,000.00 27-Jul-15 A 31-Jul-15 A Asphalt Patching
DPW426 Vespasian Blvd. (Lauradale - Wall Blvd.) CDBG Funded Complete C Behrman $176,640.75 21-Jul-14 A 20-Aug-14 A Rehabilitation of asphalt pavement including mill, patching, and 2-inch  overlay. Additional improvements include sidewalk repair, construction of ADA  ramps, installation of high-visibility crosswalks, and other roadway  striping.
DPW427 Vespasian Blvd. (Wall Blvd. - Cobblestone Ln.) CDBG Funded Complete C Behrman $1,997,536.70 18-Jul-14 A 21-Oct-14 A Rehabilitation of concrete pavement  including panel patching/replacements, clearing and sealing of joints, crack  sealing and curb repair. Additional improvements include sidewalk repair,  construction of ADA ramps, installation of high-visibility crosswalks and other  roadway striping.
DPW296 Veterans Admin. Medical Ctr Infrastructure Improvements (Canal, S Claiborne, Tulane, & S Rocheblave) CDBG Funded Complete B Central Business District $11,332,273.64 06-May-10 A 11-Oct-11 A Reconstruction of existing roadway, including the replacement of  affected utilities.
DPW405 Veterans Administration-LSU Medical Center Infrastructure Improvements CDBG Funded Complete B Tulane - Gravier $6,637,435.56 03-Jun-14 A 18-Dec-15 A An enhancement project that may include: New road striping, improved curbs,  gutters and sidewalks, improvements to drainage and catch basins, installation  of new landscaping and streetlights.
DPW201 Vienna (Corinne - Nighthart) Nighthart (Vienna - Pressburg) City Funded Construction E Read Blvd East $2,158,260.00 07-Dec-15 A Oct-Nov-Dec 2016 Reconstruction of existing roadway,  including the replacement of affected utilities.
DPW577 Virginia St (City Park-Clayton), Conti St (City Park-Rosedale), Rosedale Dr (Virginia-Canal Blvd) CIP Planning A Navarre $1,163,000.00 Jul-Aug-Sep 2017 Jul-Aug-Sep 2018 Repair  Hurricane Katrina related infrastructure damage. May include total or partial  replacement of utilities,  sidewalks, American with Disabilities Act-compliant curb ramps, driveway aprons,  curbs and road paving. 
DPW455 Wabash (Delaware - Florence) CDBG Funded Complete C Tall Timbers - Brechtel $77,118.50 09-Sep-15 A 18-Sep-15 A This project will accomplish the rehabilitation of  asphalt pavement including, milling, full depth patching and 2-inch overlay,  clearing and sealing of joints and curb repair.  Additional improvements  may include features to improve access for all users such as sidewalk repair, construction of ADA ramps,  installation of high-visibility crosswalks and other roadway striping, and  installation of new way finding and other street  signage.
DPW265 Washington ( S. Broad - Carrollton Ave) Bikeway City Funded Complete B Broadmoor $23,449.60 22-Aug-13 A 16-Dec-13 A Install new pavement markings and  signage
DPW153 Washington Avenue Pedestrian Crossing (Washington Ave. - Drexel Drive - Xavier) Federal Construction B Broadmoor $2,995,677.00 01-Dec-14 A Oct-Nov-Dec 2016 Evaluation of installing a pedestrian  bridge over Washington/Palmetto Canal near Xavier University.
DPW512 Wellington (Owens - Mandolin) City Funded Complete D Filmore $210,953.50 03-Nov-14 A 31-Dec-14 A Concrete panel replacement and  installation of ADA ramps.
DPW251 Whitney Ave & L.B. Landry (Mardi Gras Blvd - Patterson Dr) Bikeway City Funded Complete C Whitney $14,000.00 22-Aug-13 A 21-Oct-13 A Install new pavement markings and  signage
DPW211 Wisner  Boulevard Bridge Replacement City Funded Construction A City Park $17,000,000.00 10-Dec-15 A Apr-May-Jun 2017 Remove the  existing bridge on Wisner Blvd. over I-610 & Rail Road Tracks and  reconstruct a new bridge at the same location. The  new bridge will have two (2) 12 ft. travel  lanes on each direction and a 12 ft. pedestrian and bike path along Bayou St.  John.
DPW508 Wisner Shared Use Path Extension (Esplanade Ave - De Saix Blvd) City Funded Design A City Park $707,577.97 Oct-Nov-Dec 2016 Jan-Feb-Mar 2017 Concrete Shared Use Path, Pedestrian Signals, ADA Ramps,  Striping
DPW213 Wright Road (Chef Menteur Blvd - Dwyer Rd) City Funded Bid & Award E Read Blvd East $10,457,530.00 Jan-Feb-Mar 2017 Apr-May-Jun 2018 Removal of existing roadways and replace with new hot mix  asphalt or concrete roadways including new concrete curb and gutter bottom,  rehabilitation of water and drain lines, constructing driveways, sidewalks and  handicap ramps, and all work incidental to the project as shown on the plans or  as directed by the Engineer in the field.
DPW445 Youth Study Streets (Encampment, Cadillac, Davey, Milton St.) CDBG Funded Bid & Award D St. Bernard Area $1,350,000.00 Oct-Nov-Dec 2016 Jul-Aug-Sep 2017 May include underground  infrastructure improvements, roadway resurfacing and installation of  ADA compliant curb ramps, sidewalks and driveway aprons near the Youth Study Center.
 
Add to Twitter Add to Facebook Add to LinkedIn Add to Reddit

Last updated: 11/8/2016 3:28:34 PM

Was this page helpful?
 
 

()-
 Security code